The MyGate Q71S Control Board Installation Manual : Printed 11/02/2013 13:16
20
To recap:
The emergency stop link in place
The photocells have been wired to the control board
The motor(s) have been wired to the control board
The remote controls have been programmed the control board
The opening & closing cycles have been programmed
The opening & closing cycle has been tested
The Obstacle detection level / setting has been tested
Your installation is now complete!