The MyGate Q71S Control Board Installation Manual : Printed 11/02/2013 13:16
19
It is possible to reduce the sensibility level of the obstacle detection applying the following procedure:
1) Keep buttons P1 & P3 pressed at the same time - the Led DL1 will blink a certain number of times
(example: 10 blinks), then let go of P1 & P3 and keep a note of the amount of times the light blinks.
2) After the DL1 light has stopped blinking, press P1 as many times as the number of blinks seen
–
then add 3 additional times (example: 10 + 3 = 13 times). Every press of the P1 button corresponds
to the blinking of the DL1 light.
3) Confirm the procedure by pressing button P2
The procedure is now completed and the level of the obstacle detection has been reduced. If the anomalies
continue to re-occur (false and repeated stops / reversing) repeat the same procedure again up to step 2,
and then follow step 2 but instead of adding 3 additional strokes of the P1 button, this time increase by
more.
The Obstacle Detection feature on this control board is completely self-learning. Please remember that it is
essential after completing the installation programming process to run a complete open and close cycle
before general use.
Have you tried the gate automation’s full open & close cycle for the first time since completion of
the programming? Did the gate(s) open and close perfectly?
If the gates timing was not as perfect as you would like, please repeat the programming process from step
“a)”. The completion of the programming sequence will replace any previously saved settings.
Have you tried and tested the gates Obstacle Detection after completing the first cycle since
completion of the programming?
If the gates did not respond as quickly as you would of hoped, please repeat the programming process fro,
step “a)” paying particular attention to the position of the RV1 trimmer for the torque setting. Adjust this
trimmer switch to a lower position. The motors may be providing more psuh and pull power than they need
to be for the weight of your gate.
Have you tried the gate automation’s full open & close cycle for the first time since completion of
the programming?
Did the gate open and close perfectly?
If the gates timing was not as perfect as you would like, please repeat the programming process from step
“a)”. The completion of the programming sequence will replace any previously saved settings.
Have you tried and tested the gates Obstacle Detection after completing the first cycle since
completion of the programming?
If the gates did not respond as quickly as you would have hoped, please repeat the programming process
fro,
step “a)” paying particular attention to the position of the RV1 trimmer for the torque setting. Adjust this
trimmer switch to a lower position. The motors may be providing more push and pull power than they need
to be for the weight of your gate.