
The MyGate Q71A Control Board Installation Manual : Printed 06/11/2012 14:18
6
Next stage of the installation is to introduce the motor(s) to the control board. From following your
‘Motor
Installation Guide
’ each motor is wired the respective terminals as required for your particular model of
automation. If you do not have this guide to hand, below is a re-cap of connections to the control board
based on the model and which side of the gate is to open first (LEFT HAND / RIGHT HAND)
Connecting the motors to the control board
MyAster
MyHook