background image

10. FITTING THE RISER RAIL AND HANDSET 

1.  Slide the height adjuster on to the vertical rail and 

lock in place (Fig 1).

NOTE: Ensure you have the correct valve with the 

vertical rail water outlet on the top and the threaded 

outlet facing down when the hot water inlet is to the 

left.

2.  Attach the top overhead rail to the vertical rail using 

small allen key supplied (Fig 2).

3.  Attach the vertical rail to the valve and secure using 

small allen key. Then mark the position of the 

vertical rail bracket. Mark the center of the bracket 

(Fig 3).

NOTE: Ensure the rail is vertically above the valve 

using a spirit level.

4.   Ensure there are no cables or pipework behind 

the wall bracket position. Remove the vertical rail 

and position the round wall plate with the holes 

horizontally and mark position of the 2 holes for the 

screws. Drill and plug the wall. 

5.

 

Secur

e wall bracket using the pre drilled holes.

6.  Attach the overhead rail assembly to the top of the 

valve. Secure by tightening the screw on the side 

of the vertical rail with the small allen key supplied 

(Fig 4).

7.  Attach the overhead rail assembly to the wall plate. 

Secure by tightening the screw on each side of the 

bracket rail with the small allen key supplied.

8.  Screw the large fixed showerhead to the overhead 

assembly. Make sure the sealing washer is in place 

and screw tight to seal the joint (Fig 5).

6.  Connect one end of the double interlock hose to 

the outlet on the mixer valve, making sure that 

the sealing washer is in place. Then screw the 

remaining end of the double interlock hose to the 

handset, then locate the handset into the handset 

height adjuster making sure the sealing washer is 

in place (Fig 6). 

NOTE: It is the conical end of the double interlock 

hose which grips into the handset height adjuster. The 

handset will not fit in the height adjuster without the 

double interlock hose attached. The handset height 

adjuster grips the conical nut on the hose.

3

4

6

5

CAUTION

Check there are no hidden cables or pipes before drilling holes for wall plugs.  

Exercise great care when using power tools near water.  

The use of a residual current device (RCD) is recommended.

!

!

!

!

1

2

Содержание Atmos Vision

Страница 1: ...Fitting Instructions IMPORTANT This Step by Step guide should be retained after installation Atmos Vision Thermostatic Bar Mixer Valve with Overhead...

Страница 2: ...uresystemsuptoamaximumof5barrunning pressure Themixervalvemustnotbesubjectedto watertemperaturesabove80 C Thismixervalveis alsosuitableforthermalstorage unventedsystems andpumpedgravitysystems IMPORTA...

Страница 3: ...ke sure ALL components are included before starting the installation Description Quantity BarMixerValve 1 Handset 1 VerticalRail 1 VerticalRailFixingBracket 1 Overhead 1 OverheadRail 1 HandsetHolder 1...

Страница 4: ...dent method of isolating the shower should maintenance or servicing be necessary these valves SHOULD NOT restrict the flow DO NOT operate the shower outside the recommended temperatures and pressures...

Страница 5: ...MUSTbefittedinthesupply pipeworktopreventback flow Thepressureatboththehotandcoldwater suppliestothemixervalveshouldbethesame andtheinstallershouldensurethattheflowisnot affectedbyothertapselsewherein...

Страница 6: ...dsonanyof thepipefittings DONOTsolderfittingsnearthemixer valveasheatcandamagethevalvesseals Always flushthesystempriortoinstallingthevalve Beforeinstalling makesurethemixervalveiskept inacleanplaceto...

Страница 7: ...ingsure thesealingwashersareinplace screwtheunions ontothefittings Themixervalvemustbepositioned horizontallywiththehotsupplyonthelefthandside oftheoutlet Fig3 NOTE Ensureyouhavethecorrectvalvewiththe...

Страница 8: ...ve Securebytighteningthescrewontheside oftheverticalrailwiththesmallallenkeysupplied Fig4 7 Attachtheoverheadrailassemblytothewallplate Securebytighteningthescrewoneachsideofthe bracketrailwiththesmal...

Страница 9: ...ets 3 Overridethetemperaturestopbuttonbypressing thebuttonandrotatetomaximumbeingcarefulto avoidscalding Measurethetemperature 4 Thevalveshouldthenbecheckedtoconfirmthe waterisolationperformscorrectly...

Страница 10: ...evalveandcleanfilters 4 Showerheadblocked CleanShowerhead 5 Systemnotcapableofsupplyingmultipleoutlet atthesametime Reducesimultaneousdemand Checkstop servicevalvesarefullyopen Checkifenough waterpres...

Страница 11: ...MXGrouptoyouthecustomer 2 Thisguaranteeispersonaltotheoriginalpurchaserofthe componentandisnottransferable 3 Originalproofofpurchase s mustbeshownforanyclaim underthisguarantee 4 Thisguaranteedoesnotc...

Страница 12: ...CEPOLICY IntheeventofyouneedingtocontacttheMXGroup CustomerServiceDepartment thefollowing procedureshouldbefollowed 1 Beforetelephoningon08455052211theMXGroup CustomerServiceDepartmentyoushouldensure...

Отзывы: