
Patriot 1:1 Adhesive System Operations Manual
Rev. 07/2016
Page | 20
5.
Close the Pail Lift valve located below the air lift regulator (see figure 8).
Figure 8
6.
Open main air feed ball valve and listen for air leaks. The ball valve has a safety relief port and air
will leak from the port until the valve is fully open or closed (see fig. 6).
7.
Secure all fittings and correct air leaks if found.
8.
Fill Flush Tank with appropriate cleaning agent at least 3/4 full.
9.
Close the relief valve on the top of the Flush Tank.
10. Slowly turn up regulator pressure to Flush Tank to 50 -60 psi (3.5
– 4 bar) (see figure 9).
Figure 9
11. Secure all solvent leaks.
12. Test flush system on gun block, by pressing the flush buttons, test both solvent and air purge (see fig. 5)
13.
Set Gun Packing Set
– Use the packing tool to tighten both the packing nut on the side of the gun
block, trigger the gun 4-5 times and tighten the packing nuts again
– repeat this process 2 or 3
times.
Flush Tank regulator and Gauge
Flush Tank pressure relief valve
Pail Lift control valve
Содержание PATRIOT 1:1
Страница 1: ...Rev 07 2016 PATRIOT 1 1 ADHESIVE UNIT Operations Manual ...
Страница 38: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 38 ...
Страница 39: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 39 ...
Страница 40: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 40 ...
Страница 41: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 41 ...
Страница 42: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 42 ...
Страница 43: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 43 ...
Страница 44: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 44 ...
Страница 45: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 45 ...
Страница 46: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 46 ...
Страница 47: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 47 ...
Страница 48: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 48 ...
Страница 49: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 49 ...
Страница 50: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 50 ...
Страница 51: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 51 ...
Страница 52: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 52 ...
Страница 53: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 53 ...
Страница 54: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 54 ...
Страница 55: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 55 ...
Страница 56: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 56 ...
Страница 57: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 57 ...
Страница 58: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 58 ...
Страница 59: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 59 ...
Страница 60: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 60 ...
Страница 61: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 61 ...
Страница 63: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 63 ...