
Patriot 1:1 Adhesive System Operations Manual
Rev. 07/2016
Page | 18
Gun Connections:
Pre Startup Instructions:
1.
Check all hoses for wear or damage from shipping, replace if necessary.
2.
Check to be sure you have appropriate quantities of both materials to complete the job.
3.
Check and repair or replace any damaged items before starting a job.
4.
Be sure all fluid connections are tight.
5.
Adjust the pump packing nut /solvent cup
– the pump packing nuts should only be a little more
than hand tight (1/4 turn). If they are too tight it will cause the pump to bind and shutter (jerky
motion) at low pressures. Tighten as need when some material appears in the bottom of the
cup/nut.
Figure 4
Main Air Supply connection
Solvent from the flush tank
Air Purge air supply
Air supply to gun handle
Signal to activate the system
Adhesive and Activator supply
Flush/Air Purge Button
Air Purge / Solvent selector
Figure 5
Ram UP/DOWN Valve
Содержание PATRIOT 1:1
Страница 1: ...Rev 07 2016 PATRIOT 1 1 ADHESIVE UNIT Operations Manual ...
Страница 38: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 38 ...
Страница 39: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 39 ...
Страница 40: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 40 ...
Страница 41: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 41 ...
Страница 42: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 42 ...
Страница 43: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 43 ...
Страница 44: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 44 ...
Страница 45: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 45 ...
Страница 46: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 46 ...
Страница 47: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 47 ...
Страница 48: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 48 ...
Страница 49: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 49 ...
Страница 50: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 50 ...
Страница 51: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 51 ...
Страница 52: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 52 ...
Страница 53: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 53 ...
Страница 54: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 54 ...
Страница 55: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 55 ...
Страница 56: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 56 ...
Страница 57: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 57 ...
Страница 58: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 58 ...
Страница 59: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 59 ...
Страница 60: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 60 ...
Страница 61: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 61 ...
Страница 63: ...Patriot 1 1 Adhesive System Operations Manual Rev 07 2016 Page 63 ...