MAINTENANCE MANUAL
VCE-MM-02
23
Note: When re-installing the Pinch Roller Set, the Cam Roller must be aligned squarely to the
Square Bar.
Note: When aligning the Cam Roller please remember to keep the release grip locked down.
Note: Pinch-roller is color-coded by pressure force. When replacing the pinch-roller, make sure to
replace all the pinch-rollers with the same color.
Replacing the Tool Carriage
The following are those you must follow to successfully replace the Tool Carriage.
To Loosen the Carriage Belt:
Cam Roller
Release Grip
1. Unscrew the 2 retaining screws, but don’t remove them. Then turn the Adjustment
Screw anti-clockwise to loosen the carriage belt.
Adjustment Screw
Retaining Screws
Содержание ValueCut VC-1300
Страница 1: ...No VCE MM 02 Cutting Plotter VC 600 VC 1300 VC 1800 MAINTENANCE MANUAL...
Страница 8: ...MAINTENANCE MANUAL VCE MM 02 8 A Main Unit Assembly Recommend Service Parts...
Страница 10: ...MAINTENANCE MANUAL VCE MM 02 10 C Left End Assembly Recommend Service Parts...
Страница 11: ...MAINTENANCE MANUAL VCE MM 02 11 D Right End Assembly Recommend Service Parts...
Страница 12: ...MAINTENANCE MANUAL VCE MM 02 12 E X Motor Bracket and Belt Assembly Recommend Service Parts...
Страница 13: ...MAINTENANCE MANUAL VCE MM 02 13 F Carriage Assembly Recommend Service Parts...
Страница 14: ...MAINTENANCE MANUAL VCE MM 02 14 G Pinch Roller Assembly Recommend Service Parts...
Страница 15: ...MAINTENANCE MANUAL VCE MM 02 15 H Main Beam Assembly Recommend Service Parts...
Страница 16: ...MAINTENANCE MANUAL VCE MM 02 16 I Drum Assembly Recommend Service Parts...
Страница 17: ...MAINTENANCE MANUAL VCE MM 02 17 System Diagram and Components of Main Board...