Roll Systems – Maintenance Manual
82
AP-74100, Rev. 2.0, 11/01/05
Step 4 :
Assemble the PCB-box bracket onto the PCB-box, using 6 bolts M5x8.
Hang the PCB-box assy on the Support Beam.
ITEM
PART DESCRIPTION
QUANTITY
1
Hex Flange Button head M5x8 ELVZ
6
2
PCB Box Assy Rollfeed Rockhopper II
1
3
PCB Box Bracket Rollfeed Rockhopper II
1
Содержание Unwinder
Страница 2: ...Roll systems Maintenance Manual 2 AP 74100 Rev 2 0 12 01 05 ...
Страница 4: ...Roll systems Maintenance Manual 4 AP 74100 Rev 2 0 12 01 05 ...
Страница 6: ...Roll systems Maintenance Manual 6 AP 74100 Rev 2 0 12 01 05 ...
Страница 99: ...Roll Systems Maintenance Manual 99 AP 74100 Rev 2 0 11 01 05 5 3 3 Unwinder 30 Scroller support L ...
Страница 100: ...Roll Systems Maintenance Manual 100 AP 74100 Rev 2 0 11 01 05 Scroller support R ...
Страница 101: ...Roll Systems Maintenance Manual 101 AP 74100 Rev 2 0 11 01 05 ...