background image

Page 4 of 8

AI81.8

CONTEMPORARY WATER COOLERS

 

I N S TA L L AT I O N / M A I N T E N A N C E  I N S T R U C T I O N S

ELECTRIC DRINKING FOUNTAINS

Revised: 

03/29/2021

7020-007-001 

RVB

 

 

MURDOCK  MFG.  • 

15125  Proctor  Avenue  •  City  of  Industry,  CA  91746  USA 

Phone  800-453-7465  or  626-333-2543  •  Fax  626-855-4860  •  www.murdockmfg.com

Member of

3. Provide mounting surface, sufficient to support the fixture and loads on the fixture.

10.  Fixture operates within water pressure range of 174 kPa (25 psig) to 724 kPa (105 psig). Acorn Engineering 

will not warranty chiller damaged when connected to supply lines with flow pressure lower than 174 kPa (25 
psig) or higher than 724 kPa (105 psig). A pressure regulator must be furnished by others on supply line if 
inlet pressure is greater than 724 kPa (105 psig).

9. 

WARNING: Warranty is voided if installation is not made following current Acorn Engineering installation 
instructions and if components are assembled to the fixture that are not approved by Acorn Engineering.

5. It is common for electrical equipment to be grounded to water lines either within a structure or away otherwise 

remains unchanged by the materials in the water cooler. Every attempt should be made to prevent this kind of 
grounding from generating feedback into the water cooler creating electrolysis. Electrolysis will cause a 
metallic taste or cause water content to increase.

8. 

This unit must be grounded per the requirements of applicable electrical codes.

11.  Due to cold waste water, Acorn Engineering recommends that waste piping supplied by installer be insulated 

appropriately to prevent excessive condensation.

2. Carefully remove all fixture components  from packaging, preventing scratching or damage. Inspect fixture and 

all parts from damages and all parts are bolted on.

1. Read all installation instructions carefully, before proceeding.

IMPORTANT:

3. 

Waste is 1-1/4” Outer Diameter. Chiller water inlet is 3/8” Outer Diameter copper tube. Chiller water outlet is 
3/8” Outer Diameter copper tube. Drinking Fountain water inlet is 1/4” Outer Diameter connection. Bottle 
Filler water inlet is 1/4” Outer Diameter connection. Water line by others from in-wall chiller to drinking 
fountain must have adequate insulation.

7. 

Power supply must be identical in voltage, cycle and phase to that specified on the chiller data plate. Refer to 
submittal.

12. 

Per UPC 609.10-All building water supply systems in which quick acting valves are installed shall be 
provided with devices to absorb the hammer caused by high pressure resulting from the quick closing of the 
valve. These pressure-absorbing devices shall be approved mechanical devices. Water pressure-absorbing 
devices shall be installed as close as possible to the quick closing valve.

6. 

All burrs must be removed from outside of cut tubes before inserting into strainer or other components.

PRIOR TO INSTALLATION:

2. 

Provide 4” minimum clear space in front of bottom trim panel and above in-wall chiller to allow for proper 
ventilation.

5. 

Do NOT solder tubes inserted into the chiller, bottle filler or the fountain strainer as damage to the o-rings on 
the push-in fittings may result.

4. Provide rough-ins as shown on the roughing-in and dimensional drawing, including water supply, drain pipe 

and electrical service. (See rough-in details)

6. Receptacle(s) must be wired to a GFCI protected circuit. Fixture must be earth grounded per NEC (National 

Electrical Code).

7. Completely flush water supply lines of all foreign debris, before connecting to the fixture.

1. 

Water Supply Service Stop Valve, Water Connections and Electrical Connections to be supplied by others in 

accordance with local codes.

4. 

Completely flush supply lines of all foreign debris before connecting to fixture. Chiller is designed to not 

cause problems with taste, odor, color, or sediment. Optional water filters (WF1 & WF3), are available for 
remote installation should any of these problems arise from the water supply.

Содержание AI81.8 Series

Страница 1: ...l or direct charges caused by defects in the materials or any delay in the repair or replacement thereof This warranty is in lieu of all other warranties expressed or implied Product maintenance instructions are issued with each unit and disregard or non compliance with these instructions will constitute an abnormal use condition and void the warranty Stainless steel must be protected on job site ...

Страница 2: ...T ADJUST VERTICAL DIMENSIONS AS NECESSARY TO COMPLY WITH FEDERAL STATE LOCAL CODES 3 STOP VALVE NOT PROVIDED 4 WATER LINE FROM CHILLER TO FOUNTAIN SHOULD BE COVERED WITH SPONGE FOAM RUBBER OR ICE WATER TYPE INSULATION OF ADEQUATE THICKNESS 331 2 851 521 2 1334 FRAME 29 373 WASTE OUTLET 27 686 ADA MIN WALL OPENING 13 8 791 2 2019 SUPPLY INLET 17 432 ADA MIN WALL OPENING 24 610 311 2 800 17 432 WALL...

Страница 3: ...g the Tube from the Fitting ensure that the Water Line is depressurized Push Collet Square towards the Push In Fitting Body and hold While holding the Collet in pull on the PE Tubing to remove from the Push In Fitting TO CUT TUBE Cut to fit length of 1 4 PE Tubing and remove any burrs or sharp edges Ensure that the outside diameter is free from score marks Tube ends should be square INSERTING THE ...

Страница 4: ...e is 1 1 4 Outer Diameter Chiller water inlet is 3 8 Outer Diameter copper tube Chiller water outlet is 3 8 Outer Diameter copper tube Drinking Fountain water inlet is 1 4 Outer Diameter connection Bottle Filler water inlet is 1 4 Outer Diameter connection Water line by others from in wall chiller to drinking fountain must have adequate insulation 7 Power supply must be identical in voltage cycle ...

Страница 5: ...5 or 626 333 2543 Fax 626 855 4860 www murdockmfg com Member of IN OUT IN OUT 2 3 1 TO DRINKING FOUNTAIN 1 OUT IN 4 5 2 3 4 INSULATED 1 4 OD TUBING Y STRAINER ANGLE STOP BY OTHERS CHILLER w 3 8 OD TUBE INLET OUTLET CONNECTIONS OPTIONAL WF1 1500 GALLON WATER FILTER SHOWN WITH NOTE INSULATION TUBING MAY OVERLAP FITTINGS ILLUSTRATIONS MAY SHOW EXPOSED 1 4 OD TUBING FOR CLARITY ONLY 1 2 3 4 5 1 1 4 OD...

Страница 6: ...sure Y strainer assembly is orientated in the proper direction of flow Refer to arrow on strainer 9 Make up Waste connection to drinking fountain 1 1 4 OD connection 2 Air within the Fountain or the structure supply piping will cause an irregular outlet stream until purged out by incoming water 1 Before assembling Access Panels to fixture but after thoroughly flushing the supply line and connectin...

Страница 7: ...N S ELECTRIC DRINKING FOUNTAINS Revised 03 29 2021 7020 007 001 RVB MURDOCK MFG 15125 Proctor Avenue City of Industry CA 91746 USA Phone 800 453 7465 or 626 333 2543 Fax 626 855 4860 www murdockmfg com Member of FRAME ASSEMBLY 6 FASTENERS BY OTHERS CHILLER LOUVERED ACCESS PANEL BOTTOM ACCESS PANEL EXPLODED VIEW ...

Страница 8: ...ESCRIPTION 1 A0000000 MF7 CHILLER FOUNTAIN FRAME ASSY 2 A9100080 A CHILLER 3 7035 107 199 LOUVERED ACCESS PANEL 4 0279 002 000 8 32 x 3 4 L BUTTON HEAD SCREW 5 0322 001 000 8 32 LOCKWASHER STAR 7000 012 001 BUBBLER STAINLESS STEEL 7000 099 002 BUBBLER FLEXIBLE LOW FLOW 7 7000 050 001 CARTRIDGE VALVE ASSEMBLY 8 7000 060 000 CARTRIDGE FLOW REG 0 50 GPM 9 7000 091 001 CARTRIDGE PUSHBUTTON 10 7035 111...

Отзывы: