Installation Instructions

Chapter 2

Step 8

Secure inlet into opening using (4) Polebarn Screws or other appropriate fasteners (not provided).  Locate 

screws in dimples in side flanges.  DO NOT overtighten screws.  

See Figures 8A and 8B.

Dimples in Flanges

Polebarn Screws (not provided)

Frame Construction

Figure 8A

Post Construction

Figure 8B

Dimples in Flanges

Polebarn Screws 
(not provided)

Содержание MWI Series

Страница 1: ...1 Munters Corporation July 2018 QM1115r0 Instruction Manual MWI Munters Wall Inlet Models MWI4108B 6PK MWI4113B 6PK MWI4408B 6PK MWI4413B 6PK MWI Munters Wall Inlet 6 pack ...

Страница 2: ...read all instructions carefully before beginning installation Warranty For Warranty claims information see the Warranty Claims and Return Policy form QM1021 available from the Munters Corporation office at 1 800 227 2376 or by e mail at aghort info munters com Conditions and Limitations Products and Systems involved in a warranty claim under the Warranty Claims and Return Policy shall have been pr...

Страница 3: ...3 Munters Corporation July 2018 QM1115r0 Index Chapters Page 1 Unpacking the Equipment 4 1 1 Parts List 4 1 2 Inlet Dimensions 5 2 Installation Instructions 6 3 Cabling 13 ...

Страница 4: ...eported immediately to your freight carrier Each Box Includes Parts to build 6 Inlets Each MWI Inlet Requires ID Qty Cat No Description 1 1 Left Side End Cap PL 2 1 Right Side End Cap PL 3 2 Top Bottom Header PL 4 1 Brush Seal 5 2 2 x 3 L Screw 6 1 Door Curved PL 7 1 x Mesh Guard GAW Optional Lift Kit FA1500 A 1 AC0211 AC0212 Azuma Bolt and Nut PL B 1 KS2601 6 GA x 1 875 Open Eye Lag Screw ZP C 1 ...

Страница 5: ... Size A B C D E F Wall Opening 8 MWI4108 41 8 443 16 111 8 41 2 97 8 81 2 H x 411 2 W MWI4408 44 8 473 16 111 8 41 2 97 8 81 2 H x 441 2 W 13 MWI4113 41 13 443 16 161 8 41 2 147 8 131 2 H x 411 2 W MWI4413 44 13 473 16 161 8 41 2 147 8 131 2 H x 441 2 W Unpacking the Equipment Chapter 1 ...

Страница 6: ...Right Side End Cap See Figure 1 2 1 Inlet Assembly Right Side End Cap Top Bottom Header Top Top Bottom Header Bottom Step 2 Slide the Curved Door Hinge into the rounded opening in the Bottom Header See Figure 2 Figure 2 Figure 1 Top Bottom Header Bottom Top Bottom Header Top Curved Door Curved Door Hinge Rounded Opening ...

Страница 7: ...sh Seal into the Slot in the Top Header See Figure 3 Figure 3 Top Bottom Header Top Brush Seal Brush Seal Slot in Top Header Step 4 Slide the Wire Mesh Guard into the Slot in the Top and Bottom Headers See Figure 4 Figure 4 Top Bottom Header Top Wire Mesh Guard Wire Mesh Guard Top Bottom Header Top ...

Страница 8: ...on Instructions Chapter 2 Step 5 Secure the Left Side End Cap onto the Top and Bottom Headers using a Rubber Mallet Use caution when doing this and NEVER use a Framing Hammer See Figure 5 Figure 5 Partially Assembled Inlet Rubber Mallet Left Side End Cap ...

Страница 9: ... to Wall Opening listed in chart on Page 5 A minimum of 10 12 from ceiling to the top inside of framing is required See Figure 6A and 6B 2 2 Inlet Installation Framed Opening W Framed Opening H Framed Opening W 10 12 Min Framed Opening H Spacer Frame Construction Figure 6A Post Construction Figure 6B ...

Страница 10: ...July 2018 10 QM1115r0 Framing MWI Inlet Step 7 Slide Inlet into framed opening from inside building See Figure 7A and 7B Installation Instructions Chapter 2 Frame Construction Figure 7A Post Construction Figure 7B MWI Inlet ...

Страница 11: ...g using 4 Polebarn Screws or other appropriate fasteners not provided Locate screws in dimples in side flanges DO NOT overtighten screws See Figures 8A and 8B Dimples in Flanges Polebarn Screws not provided Frame Construction Figure 8A Post Construction Figure 8B Dimples in Flanges Polebarn Screws not provided ...

Страница 12: ... the center of the groove of the flange Make sure the bottom flange is straight when fastening Push up slightly on center of top header or 0 6cm and secure using 1 Polebarn Screw not provided DO NOT overtighten screws See Figures 9A and 9B Frame Construction Figure 9A Post Construction Figure 9B Polebarn Screws not provided Groove in flange Polebarn Screws not provided Groove in flange ...

Страница 13: ...e with rod Building Wall Ceiling AC1195 Baffle return spring Fasten spring into stud with lag screw or bolt and nut Truss AC1013 or AC1044 Cable SPRING TENSION with baffle fully closed and cable pulled tight stretch spring 12 14 and fasten Step 10 Attach pulleys in line with screw hooks at each endwall See Figure 10A and 10B Figure 10A AC1264 Single Pulley Bracket Provide adequate support Ceiling ...

Страница 14: ... top flange of Inlet in line with Lift Line hole in door See Figures 11A and 11B For Post Frame Construction also install a screw hook on each post near ceiling See Figure 11C Flange of Inlet Screw Hook Figure 11A Figure 11B Figure 11C Flange of Inlet Screw Hook 2 Screw Hook Lift Line Hole in Door ...

Страница 15: ...2 Pull main rod or cable from winch or actuator through pulleys and screwhooks to weights or return spring on opposite end wall See Figures 10A 10B 12A and 12B Be sure to coil approximately 1 of cable on winch Figure 12A Main Rod or Cable Screw Hook Main Rod or Cable Screw Hook ...

Страница 16: ...Clamp D Lift line should be attached 14 back from hook toward the winch end Run each lift line through the adjacent Nylon Guide Link C and attach Azuma Bolt and Nut A See Figure 13A and 13B Cable Clamp D Azuma Bolt Nut A Lift Line E Eye Screw B Nylon Guide Link C Figure 13A Note If optional kit Lift Package FA1500 was purchased hardware mentioned below in Step 13 is included If not purchased hardw...

Страница 17: ...17 Munters Corporation July 2018 QM1115r0 Figure 13B Cabling Chapter 3 Cable Clamp D Azuma Bolt Nut A Lift Line E Eye Screw B Nylon Guide Link C ...

Страница 18: ... few times to make sure baffle moves smoothly and each door remains even over the total length of house See Figure 14 Figure 14 To Weights or Return Spring Step 15 Locate 2 L Screws 1 2cm above Top Header and evenly space across the inlet Thread L Screws in far enough to hold the door in the close position Make sure L Screw does not interfere with the Lift Line or Main Rod or Cable See Figure 15A ...

Страница 19: ...19 Munters Corporation July 2018 QM1115r0 Figure 15B Cabling Chapter 3 UNLATCHED POSITION LATCHED POSITION L Screw provided L Screw provided ...

Страница 20: ...s Phone 62 818 739 235 Italy Munters Italy S p A Chiusavecchia Phone 39 0183 52 11 Japan Munters K K Phone 81 3 5970 0021 Korea Munters Korea Co Ltd Phone 82 2 761 8701 Mexico Munters Mexico Phone 52 818 262 54 00 Russia Munters AB Phone 7 812 448 5740 Singapore Munters Pte Ltd Phone 65 744 6828 South Africa and Sub Sahara Countries Munters Pty Ltd Phone 27 11 997 2000 Spain Munters Spain S A Phon...

Отзывы: