
FORM: QM1110M
Rev. 1, November 2013
Page 4 of 12
Munters Corporation
4215 Legion Dr. Mason, MI 48854-1036 USA
Ph: +1 517 676-7070 Fax: +1 517 676-7078
www.munters.us
Step 1
Construct a framed opening in ceiling according
to Chart A and fasten to trusses or bracing
between trusses. Trim out framing with ‘J’-trim
if a metal ceiling is used.
See Figure 1A and
1B.
If inlet is being installed in a house with
a Tri-Ply ceiling, construct frame as shown in
Figure 1C.
Step 2
The hardware should already be installed as
shown in
Figure 2
. The Lift Lines should be
turned towards the actuator and the Eye Bolt
will be away from the actuator.
50 - 100 mm Framing
50 - 100 mm Framing
To Actuator
Figure 1A
Figure 2
See Chart A
See Chart A
Figure 1C
50 - 100 mm Framing
Metal Ceiling
Figure 1B
If installing inlets near heaters, it is
recommended to install the BI28/BI48
inlet at a location far enough from heaters
that will give a maximum temperature of
65.5°C. This should be approximately
610 - 915 mm from the heater.
IMPORTANT NOTE
Eye Bolt
Inlet
Width
Length
BI28 647,7 mm
647,7 mm
BI48 647,7
mm
1181,1
mm
Chart A