COMMISSIONING THE CABINET 

Check all the following points before starting to commission the workstation. 

1.

Switch "OFF" the cabinet at the Mains ELCB switch.

2.

The gas flow has been set at the factory to 35 litres per minute. However during initial

commissioning please check this gas flow as described on page 10 by placing a gas flow meter

and pressure gauge in the gas line.

3.

Open the mixed gas pressure regulator fitted to the gas bottle sufficiently high to maintain an inlet

pressure to the cabinet of approximately 30 psi (2 Bar) with the gas flowing.

4.

Ensure that the Gas Trap Bubble Bottle is filled up to the water level line and the gauntlets and

bungs are both fitted to the cabinet. (Page 7)

5.

Hang the Indicator Pump on the hook adjacent to the electrical socket, plug the pump into the

socket and switch "ON".

6.

Ensure that the bottom lid of the petri dish entry lock is in the closed position. Remove the top lid of

the lock and place it at an angle over the top of the lock ensuring that there is a gap for the flushing

gas to escape.

7.

Check that the Atmospheric Conditioning Sachet and the Palladium Conditioning Sachet are  in

position underneath the shelf. The Atmospheric Conditioning Sachet should be put in first to the

rear of the cabinet

8.

Set the humidistat to 70% R.H.

9.

The commissioning switch will be found on the control panel. This is held in the 'OFF' position by a

small keeper. Slide the keeper and place the switch in the 'ON' position.

10.

Now switch on the cabinet at the E.L.C.B.

11.

Gas will begin to flow into the incubator and out of the lock. Adjust the gas flow if necessary (see

page 10)

12.

Leave the gas flowing for approximately 25 minutes then place the anaerobic indicator bottle in

position filled to the appropriate level with indicator solution and connect it to the pump with the

flexible tubing. (See the instructions regarding the preparation of the indicator solution on page 7)

13.

If the indicator solution remains colourless the cabinet is anaerobic. If the solution turns blue, leave

the gas flowing until it becomes colourless.

14.

During this period, the inside of the cabinet will mist over, but eventually this condensation will

clear. The catalyst sachet will also get quite warm.

15.

Once the cabinet is anaerobic, switch the commissioning switch off on the control panel and

replace the keeper to prevent accidental switching.

16.

Replace the lid of the petri dish entry lock.

17.

Now check all the functions are working.

Содержание AW300SG

Страница 1: ...ANAEROBIC WORKSTATION AW300SG MANUAL PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION Burnt Mill Elizabeth Way Harlow Essex CM20 2HU UK 44 45 met munro group co uk MUNRO 6 22...

Страница 2: ...T 8 10 CHECKING THE GAS FLOW 9 11 WORKING INSIDE THE CABINET WITH BARE HANDS 10 12 SLEEVE ASSEMBLY 11 13 REMOVAL OF CONDENSATION FROM INSIDE THE INCUBATOR 12 14 THE WATER GAS TAP TUBE 12 15 TRANSFERRI...

Страница 3: ...t Condensation drain bottle Removable exterior port covers complete with retaining clips Bare hand operation ports Catalyst Conditioner Electric supply Gas inlet 6mm push in tube Shelf Bottom door of...

Страница 4: ...CAPACITY 300 Petri Dishes DOOR SEALING Manual GAS Mixed Gas 10 H2 10 CO2 80 N2 OXYGEN REMOVAL FROM AIRLOCK Positive Pressure flushing FABRICATION MATERIAL Acrylic OVERALL DIMENSIONS Length 33 838mm De...

Страница 5: ...XED GAS 35L min The diameter of the pipes connecting the cylinder to the cabinet should be selected according to the length of run to give a minimum pressure drop this will give maximum gas utilisatio...

Страница 6: ...tlet pressure sufficient to maintain pressure at inlet to cabinet Primary gauge showing pressure in bottle 6mm diameter flexible plastic tube 1m long Mount cabinet on strong bench at convenient height...

Страница 7: ...socket Place the conditioning sachet then the catalyst in the channels under the tray in the order shown Conditioner Catalyst Bung Sleeve assy O ring Port Cover Powder Indicator solution bottle fits h...

Страница 8: ...wing the pump to run for about 2 minutes If the pump is allowed to run continuously the indicator solution tends to evaporate and requires replacing on a regular basis This is not necessary PREPARING...

Страница 9: ...chet are in position underneath the shelf The Atmospheric Conditioning Sachet should be put in first to the rear of the cabinet 8 Set the humidistat to 70 R H 9 The commissioning switch will be found...

Страница 10: ...and lift lid as shown e g Gas flow required 35 L minute Pressure Gauge Reading shows 2 Bar Flow Meter Reading 35 35 20 2 L M 1 2 1 73 1 Any adjustment to the gas flow should be made using the flow re...

Страница 11: ...oximity to the left hand port Take hold of the left hand rigid cuff with the right hand and withdraw the left hand Place the left hand rigid cuff over the bung using the right hand Press the cuff over...

Страница 12: ...ollowing the diagrams shown below The assembly consists of four parts 1 The sleeve 2 The rigid cuff 3 The wrist cuff 4 The O rings The assembly fits together as shown in the following sketches 3 Trim...

Страница 13: ...humidistat which is situated inside the unit just behind the transfer lock The humidistat switched the cooling fan on and off automatically as required THE WATER GAS TRAP TUBE The water gas trap tube...

Страница 14: ...e lock and hold in place with the thumb of the left hand while closing the door with the fingers Now remove the top lid of the lock and withdraw the holder Replace the lid and repeat for further holde...

Страница 15: ...re of 160 C for a period of two hours The sachet of conditioner can if necessary be dried at room temperature The chemicals can then be returned to their respective containers for further use When rep...

Страница 16: ...IXED GAS INPUT PIPE SIZE 6 mm DIA INCUBATOR POSITIVE PRESSURE SETTING 6 mm WG INCUBATOR LEAK NOT DETECTED 1 HOUR TEMPERATURE SETTING 36 5 deg C OVER TEMP SETTING OF THERMAL FUSE 98 deg C SPOTLIGHT COM...

Страница 17: ...AW300SG MUNRO Ltd urnt Mill Elizabeth Way Harlow Essex CM20 2HU UK United Kingdom 44 45 Incubator for the environmentally controlled incubation of anaerobic bacteria I certify that the apparatus ident...

Отзывы: