5
Roof beam
Ceiling
Fig.4-7
Fig.4-8
FOR ORIGINAL CONCRETE BRICKS
Install the hanging hook with expansible bolt into the
concrete deep to 45~50mm to prevent loose.
Fig.4-10
2
2
1
1
1
1
1
1
Base
Base
1
1
2
2
2
2
1
1
Frame
assembly
Fig.4-4
2. Version I Installation
Mark
where the screws will go
on
the
wall,
according
to
the
unit mounting
holes
or
dimensions
specified
in
Fig.4-11, Fig.4-12
.
The
drain
pipe
for
condensate
water
must
be smooth enough to allow unobstructed water
discharge.
As
shown
in
Fig.4-5
,
fasten
four
screws
(
①
)
into
a
proper
masonry structure.
Feet
Fig.4-6b
4. Installation with lifting eye bolts
Use
different
bolts
for
the
installation,
according to
the
installation
surroundings.
WOOD STRUCTURE
Put
the
square
timber
hori
zontally
on
the
roof
beam,
and then
install
the
hanging
bolts.
Timber on beam
Hanging bolts
Embedding
bolts.
(Sliding insert
(Blade shape
insert)
Steel bar
Embedded bolt
(Pipe suspension and embedded bolt)
Fig.4-9
CONCRETE BRICKS
Fig.4-5
Diagram for fixing the unit body
3. Version II Installation
The
footings
shown
in
Fig.4-6a,
Fig.4-6b
are
optional.
You
can
purchase
them
separately
and
install
them
as
follows:
1. For
the covered equipment,
fix
the
base according
to
Fig.4-6a before
hand
.
2. Place the feet alongside the unit to be installed.
3.
Place
the
unit base mounting
holes
into
the
corresponding
feet
positioning
pin
and
install the
screws
①
*2 and
②
*2 to fix the feet, according to
Fig.4-6b
.
4.3
Indoor Unit Installation
1. Remove the frame (covered equipment)
Remove screws
①
*2 and
②
*2 and then the frame.
Fig.4-6a
C
overed equipment