22
MAINTENANCE PLAN
1)
DAILY CHECKS:
- carry out the checks listed on page 18
2)
WEEKLY CHECKS:
- check operation of the control enabling device;
- check operation of the outreach limiting device.
3)
MONTHLY CHECKS:
- make sure that the points indicated in TAB 1 of "Spare parts catalogue" are greased;
- make sure that the filters are cleaned;
- make sure that the safety devices work properly;
- make sure that the hand-pump works properly;
- make sure that the locking bolts of the base of the vehicle are correctly tightened;
- check the level of oil in the tank;
- make sure that the wiring boxes are dry inside;
- visual check of the structures with special attention to the welding points connecting the
articulated parts of the boom and jib.
4)
SIX-MONTHLY CHECKS:
- it advisable to have the machine inspected by the manufacturer every six months.
If you wish to carry out a complete check of the machine yourselves and you have the
necessary specialised personnel, proceed according to the list of the recommended checks to
be carried out, attached to this manual.
EXTRAORDINARY MAINTENANCE
IMPORTANT NOTICE:
Any repairs requiring the use of welding equipment must be carried out by a
qualified welder according to UNI EN 287 or equivalent standards.
The added material used must suit the characteristics of the material to be welded. If required, we are
at your disposal for any information on this subject.
Before carrying out any welding, disconnect the battery terminals, starting with the negative pole.
Содержание 160 ALU
Страница 8: ...8 MULTITEL 220 ALU AF ...
Страница 23: ...23 ADDITIONAL INSTRUCTIONS FOR PARTICULAR OPTIONS ...