PAGE 28 — GA-6RE/GA-6REA A.C. GENERATORS — OPERATION & PARTS MANUAL — REV. #0 (06/06/05)
Generator Storage
For storage of the generating set for over 30 days, the
following is required:
■
Drain the fuel tank completely, or add STA-BIL to the fuel.
■
Run the engine until the gasoline in the carburetor is
completely consumed.
■
Completely drain the oil from the crankcase and refill with
fresh oil.
■
Remove the spark plug, pour 2 or 3 cc of SAE 30 oil into the
cylinder and crank slowly to distribute the oil.
■
Slowly rotate the engine a few times with the starter Rope and
install a new plug.
■
Pull out the starter rope slowly and stop at the compression
point.
■
Clean all external parts of the generating set with a cloth.
■
Cover the generating set and store in a clean, dry place.
GA-6RE/GA-6REA — PREPARATION FOR LONG TERM STORAGE
Содержание GA-6RE
Страница 2: ...PAGE 2 GA 6RE GA 6REA A C GENERATORS OPERATION PARTS MANUAL REV 0 06 06 05...
Страница 37: ...GA 6RE GA 6REA A C GENERATORS OPERATION PARTS MANUAL REV 0 06 06 05 PAGE 37 NOTE PAGE...
Страница 75: ...GA 6RE GA 6REA A C GENERATORS OPERATION PARTS MANUAL REV 0 06 06 05 PAGE 75 NOTE PAGE...