GB – 3
Remove From Crate
1. Remove crate top and sides.
2. Remove protective plastic covering.
3. Remove 5/16 x 2" hex bolts from Manual Package.
4. Cut and remove four plastic shipping bands from
axles.
Unit can remain on crate base during handle installation.
Install Handles
Handles are shipped in downward position (see Figure 1)
with all levers and cables correctly positioned.
NOTE: MAX Mk II handles can be mounted in two
positions depending on the desired handle length.
Ensure that both sides are mounted at the same length.
Muck-Truck Mk IV handles have one mounting location.
NOTE: Install handles one side at a time.
Figure 1
1. Cut tie-straps retaining handles.
2. Remove two 5/16 x 2" hex bolts, nuts and washers
securing one side of cowling cover plate. Retain all
hardware.
3. Remove 5/16 x 3" shipping hex bolt securing
handle to unit. Retain nut and washers; discard 3"
hex bolt.
Figure 2
4. Align handle with the holes in the cowling cover and
attach with two 5/16 x 2" bolts, washers and 5/16"
lock nuts removed earlier.
5. Insert 5/16 x 2" hex bolt from Manual Package into
remaining hole and secure with washers and nut
removed from shipping bolt.
6. Tighten hardware securely.
7. Repeat steps 2 – 6 for remaining side.
IMPORTANT: Ensure that MAX Mk II handles are
mounted at the same length.
8. Remove unit from crate base.
ASSEMBLY
Figure 1
Tie Strap
3" Shipping
Bolt
Handle
Cowling
Mounting Bolts
Cowling
Cover Plate
Figure 2
Handle
5/16 x 2"
Hex Bolt
5/16 Hex
Nut
Flat Waher
Flat
Washer
Содержание MAX Mk II Dumper
Страница 11: ...GB 11 NOTES...
Страница 21: ...GB 21 NOTES...
Страница 29: ......
Страница 30: ...Niche Product Sales LLC 586 Mercantile Place Port Saint Lucie FL 34986 www mucktruck com...