background image

 

MARKINGS ON THE MTM17-33 HEATER 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

[CAUTION! HIGH TEMPERATURE!] 

 

 

 

 

 

[DO NOT TOUCH THE FUEL OUTLET  

 

 

 

 

 

AND THE STACK! RISK OF BURN!] 

 

 

THERMOSTAT 

STB

 

FUEL 

INLET 

 

9. The heater operation 

CAUTION!!! 

OIL MUST NOT BE POURED INTO THE FUEL TANK DURING DEVICE OPERATION. OIL MUST 

NOT BE POURED INTO THE FURNACE AND IT MUST NOT BE FIRED UP IF THE FURNACE 

CHAMBER OR BOWL ARE STILL HOT!!! ALWAYS WAIT UNTIL THE BURNER PLATE 

HAS COOLED DOWN ENTIRELY. 

FAILING TO FOLLOW THE ABOVE INSTRUCTIONS MAY RESULT IN AN UNCONTROLLED 

IGNITION OF OIL FUMES AND SCALDING. IT MAY ALSO CAUSE DESTRUCTION OF 

CAST IRON ELEMENTS!!! 

Switching the device on 

While starting the device, the user may stand on the left or right side or in front of the device. Caution 

is advised so that the flap of the device does not slam the hands. Therefore, the user must not perform 

any actions intended to start the device when they are behind it. 

After start-up, the heater enters proper phases of operation depending on the settings provided by the 

user and information fed by the sensors in the control system. 

 

 Remove water from the fuel tank and fill it with oil (e.g. used oil) if necessary. 

 

Check whether the feeding pipe (burner) of the device is maximally pushed to the device housing (if 

not, push it). 

 

Insert the power plug in the power socket (230V / 50Hz) - the diode 

STANDBY

 lights up. 

 

Draw  the  top  part  of  the  heater  housing  aside  and  remove  the  combustion  chamber  cover. 

Then, take the deflector  out (if necessary, thoroughly clean the  combustion bowl, the base  which 

it is placed on and the entire combustion chamber). 

 

Check whether the furnace bowl is cool and clean and pour ca. 250 ml of fuel or diesel oil. 

 

Install the deflector. 

 

Fire the oil up using paper crumbled into a ball - set it on fire and throw onto the furnace bowl. 

 

Replace  the  combustion  chamber  cover,  fastening  it  with  locks,  and  close  the  top  housing  part 

of the heater. 

 

Press the 

Start

 button on the control panel (the diode 

OPERATION

 will start to blink). 

 

After  about  10-15  minutes,  depending  on  the  room  temperature,  the  fuel  pump  and  the  fan 

will  activate  and  the  stove  will  start  to  operate  on  the  minimal  power,  regardless  of  the 

position of the power regulating knob (30 kW; combustion at ca. 3 l/h). After 30 minutes, it will be 

 possible  to  regulate  the  device  power  with  the  regulating  knob.  If  the  knob,  at  start-up,  

was 

in 

another 

position 

than 

minimum

the 

device 

will 

automatically 

start 

operating with the power set by the regulating knob position after 30 minutes. 

Содержание 52

Страница 1: ...UNIVERSAL OIL HEATER TYPE MTM 52 kW ORIGINAL MANUAL v 08 2015 ...

Страница 2: ...n Risk assessment and risk reduction EN ISO 13732 1 2008 Ergonomics of the thermal environment Methods for the assessment of human responses to contact with surfaces Part 1 Hot surfaces EN ISO 13857 2008 Safety of machinery Safety distances to prevent hazard zones being reached by upper and lower limbs EN ISO 14159 2008 Safety of machinery Hygiene requirements for the design of machinery EN 60335 ...

Страница 3: ...ical contamination 3 Use environmental conditions The universal oil heater type MTM 52 must be used in the following conditions temperature relative humidity pressure IP protection level against environmental impact good ventilation of the heated room device noise 4 Safety aspects It is inadmissible to use fuels other than specified in point 1 of the Original Manual In particular it is forbidden t...

Страница 4: ...peration until the furnace has cooled down to the temperature below 35 C The other bimetallic sensor is located on the heat exchanger as well and its threshold temperature equals 90 C Its contact opening resulting from exceeding the threshold temperature causes the stove to immediately enter the Overheating phase see point 8 in this Manual The heater is also equipped with a weight sensor located u...

Страница 5: ...amber during heater operation to provide optimal draught install an at least 5 metre long smooth vertical stack pipe resistant to high temperature not aluminium check the leaktightness of all stack connections tighten them with insulating tape if necessary make sure that the combustion bowl is located in the combustion chamber centrally place the deflector inside the combustion chamber according t...

Страница 6: ...f the pipe runs through a wall or a window the maximal bend angle equals 45 and the minimal stack height should be increased to 6 meters the already existing ventilation ducts must not be used to build the stack system CAUTION IF AN ADDITIONAL HEAT EXCHANGER IS INSTALLED ON THE STACK SYSTEM e g EXHAUST FUMES ECONOMISER IT IS ADVISABLE TO CLEAN THE EXCHANGER AT LEAST ONCE A MONTH depending on the f...

Страница 7: ...he standby phase Stop no heat is generated the fan and the pump do not operate The diode STANDBY lights on the controller in this time Pressing the button Start causes the diode OPERATION to light up and the stove to go into the firing up phase During this phase the diode OPERATION is blinking When the furnace has heated up to ca 40 C contact shorting of the control thermostat located next to the ...

Страница 8: ...peration wait until the stove has cooled down i e the fan has switched off and press the button on the casing of the bimetallic sensor Then press the Stop button which will cause the heating diode and the sound signal to turn off The stove may now be switched on again The overflow signal is generated by the micro switch located under the overflow tank The contact opening signals that the tank has ...

Страница 9: ...ether the feeding pipe burner of the device is maximally pushed to the device housing if not push it Insert the power plug in the power socket 230V 50Hz the diode STANDBY lights up Draw the top part of the heater housing aside and remove the combustion chamber cover Then take the deflector out if necessary thoroughly clean the combustion bowl the base which it is placed on and the entire combustio...

Страница 10: ...ration of the device clean the furnace bowl and other combustion chamber elements everyday before firing up The maximal device operation time without cleaning the bowl is about 7 12 hours depending on the employed oil intended for combustion check the passability of the overflow pipe the pipe in the lower part of the combustion chamber directly over the overflow bowl clean if necessary clean the c...

Страница 11: ... too thick or too cold Dilute with diesel oil Check the pump control thermostat and replace it if needed Check the motor and see if the pump is not soiled on the inside Check STB and overflow protection 5 The fuel ducts is obstructed oil returns to the tank through the primary duct Clean the fuel duct and replace it if needed 6 The pump operation control thermostat has not reached proper temperatu...

Отзывы: