background image

3

There are many possible ways to install your new MTI tub, and some may require different framing 

than the following instructions. Keep in mind that the framing should always provide a level surface for 

the rim of the tub and sufficient space below the tub for bedding compound. 

Access must be pro-

vided to each pump and/or electrical component on your tub. The access panels must have 

a minimum size of 16” x 14” for installation and future servicing of the pump and/or electrical 

equipment. MTI will not authorize any service unless clear access is available. Access from a 

crawlspace or incomplete access to all equipment may result in warranty claims being denied. 

Additional access to plumbing fixtures is strongly recommended. It is the responsibility of the installer to 

comply with local plumbing codes regarding pump and plumbing access. 

Note: 

Do not allow any mate-

rial such as insulation within 8” of pump. Pump must have sufficient air space surrounding it for circula-

tion and proper operation.

GENERAL INSTALLATION GUIDELINES 

Take all final installation dimensions from your 

tub. 

All printed specifications for MTI tubs have +/- ½” tolerance AND ARE SUBJECT TO 

CHANGE AT ANY TIME.  Note: add approximately 2-3 inches to the over-all tub height for drop-

in tubs equipped with pre-leveled foam base and/or pre-leveled frame.  The bolts/screws 

through the mounting feet on the pump may be loosened or removed once the tub is in place

,

 if 

necessary for future servicing.

MTI tubs are not equipped with leveling feet! Wooden blocks under must be removed prior to 

installation.

 

The tub must be leveled from the top flange in both directions

.MTI recommends Quikrete 

#1103 sand/topping mix

 for bedding the tub

.

 

Plaster

,

 sheet rock mud

 and sand

 are NOT sufficient 

bedding compounds

!

 Determine the final height of the tub rim by measuring from the underside of the 

rim to the floor on the

 drain side

 and add ½” to allow for bedding compound

, unless your tub has our 

factory installed pre-leveled foam base.

 The tub must be leveled by the rim, and supported by the 

bedding (or 

MTI 

foam base) under the full length of the tub bottom. It is recommended to use a plastic 

sheet barrier on top of and underneath the bedding compound. Carefully lower tub into place. Shift tub 

side to side to settle into compound. The tub will not drain properly if not level both front to back and 

side to side. Use care not to damage any plumbing, wiring or other options when bedding the tub. Let 

compound harden over-night before use. Failure to properly bed the tub will void any warranty on the 

tub shell.

NOTE:

 Pre-leveled frame eliminates the need to frame the walls or use bedding compound to level the 

tub, assuming the floor is perfectly level. If not, some bedding compound may be needed to achieve level. 

The pre-leveled frame adds ½ to 3 inches of height, depending on the specific model of tub.  

Mark a level line on the stud walls using the measurement determined 

above. A 2” x 2” or similar stringer will be attached to the studs touch-

ing this line. All mounting surfaces must be level to allow for proper 

drainage. Framing of the same height should be constructed across 

the front of the tub for skirt, tile or other material. Remember to allow 

for access to each pump, blower and/or electrical component.  

DROP IN

Use the above dimension as the finished deck height from the 

floor. The drop in opening should be approximately 1 ½ inches 

smaller than the outside dimensions of the tub. This will create a 

¾ inch ledge to support the entire rim of the tub. It is best to have 

as large an opening as possible in the deck to clear the plumbing 

and other tub accessories during install while still pro-viding full 

support for the rim. Full size templates for oval tubs can be 

purchased through your distributor.

NOTE: Most MTI BASICS tubs are NOT undermountable. See 

individual tub specification sheets.

Have tub at jobsite and measure or template very carefully before cutting any decking materials. 

MTI is not responsible for any preparatory labor or materials.

 If your application calls for solid 

surface material covering only the width of the tub flange, additional support for the solid surface material 

is 

not 

necessary. 

    

(continued on next page)

Leveling Stringers

For whirlpools, be sure to provide  

an opening of at least 16” x 14”

for pump access.

For whirlpools, be sure to

provide an opening of at

least 16" x 14" for pump

access. 

ALCOVE

Содержание BASICS MBCRFS6632

Страница 1: ...GUIDE Thank you for choosing an MTIS BASICS bath You have purchased a high quality acrylic bath hand crafted with pride in the USA We know it will give you many years of pleasure The instructions in...

Страница 2: ...hydrotherapy bath since medication may induce drowsiness affect heart rate blood pressure and circulation DANGER To reduce the risk of injury enter and exit the bath slowly WARNING Never operate elect...

Страница 3: ...ranty 12 13 Commercial Warranty 14 15 A T T E N T I O N I N S T A L L E R Access must be provided to each pump and or electrical component on your tub The access panel must have a minimum size of 16 x...

Страница 4: ...op of bowl K Inside bowl length at bottom of bowl L Flange edge depth M Top flange width N Drain center to edge of flange O Allow 1 2 to 1 to D for wet bedding P Pre leveled frame height Adds 1 2 3 to...

Страница 5: ...as ordered 6 If any leaks or operating problems are discovered do not complete installation until prob lems are resolved MTI will not be responsible for any costs involved with removing or reinstallin...

Страница 6: ...of the tub bottom It is recommended to use a plastic sheet barrier on top of and underneath the bedding compound Carefully lower tub into place Shift tub side to side to settle into compound The tub...

Страница 7: ...e Sand Mix to fill void between the bottom of the tub and floor If your tub was ordered with the pre leveled foam option no bedding compound is necessary Note If your floor is not completely level use...

Страница 8: ...c drying cycle The blower will turn on for 1 2 minutes approximately 20 minutes after the air system is turned off This drying cycle cannot be cancelled Any attempt to cancel this cycle only resets th...

Страница 9: ...your tub was ordered with the Virtual Spout tub filler the tub will fill through the small port on the inner wall of the tub Incoming water is connected to mixing valves mounted on the wall or a smal...

Страница 10: ...autions should always be followed including 1 All MTI BASICS whirlpool and air baths require a separate 15 amp 110VAC circuit for each pump or air system blower The inline heater for whirlpools adds 5...

Страница 11: ...necessary Q There is a leak at the pump when it s turned on How do we stop the leak A Check the rubber O rings for proper seating Tighten the large union nut rings on the pump These may have loosened...

Страница 12: ...ch as an old toothbrush gently brush around each non functioning jet Caution Do not turn the air system on while you have cleaning solution in the tub Drain and rinse tub Repeat if necessary Q Can I r...

Страница 13: ...the possibility of bacteria growth within the system 8 Bubble bath should only be used sparingly The action of the system will greatly increase the amount of bubbles The system must also be cleaned af...

Страница 14: ...ish remover Wintergreen oil dry cleaning solution lacquer thinners gasoline pine oil etc 4 Remove dust and dry dirt with a soft damp cloth 5 Clean grease oil paint or ink stains with isopropyl rubbing...

Страница 15: ...l or consequential damage loss of time inconvenience incidental expenses labor or material charges or any other costs related to the application of this warranty Warranty Limitations Your warranty is...

Страница 16: ...e unit properly allowing clear access for service Unit must be water tested prior to final enclosure Failure to do so will void warranty Damage occuring to the unit during installation is the responsi...

Страница 17: ...for this warranty to become effective Warranty Limitations Your warranty is void if unit is not water tested and inspected prior to final enclosure Our warranty does not cover defects damage or failur...

Страница 18: ...e unit properly allowing clear access for service Unit must be water tested prior to final enclosure Failure to do so will void warranty Damage occuring to the unit during installation is the responsi...

Страница 19: ...factured by MTI Baths Inc mtibaths com 670 N Price Road Sugar Hill GA 30518 800 783 8827 770 271 8228 Fax 800 438 8827 Copyright 2015 by MTI Baths Inc Modification Rights Reserved Part BASICSTUB rev 0...

Отзывы: