Premier SD60E Diesel Engine
Configuring Locomotive for 2-Rail or 3-Rail Operation
(
As shown above, the 2Rail/3Rail switch is located underneath the roof hatch
)
Your locomotive can be configured to operate on 2-Rail or 3-Rail track. From the
factory the locomotive is configured to operate on 3-Rail Track. To configure the
locomotive for 2-Rail track operation, please do the following:
1. Remove the center rail pickup roller assemblies as seen in the figure below.
2. Change the power input from 3-Rail to 2-Rail as seen in the figure above
.
Figure: 2-Rail/3-Rail Operation
Figure: Adding Smoke Fluid
Figure: Smoke Unit C 2Rail/3Rail Switch
Figure: Accessing Controls
Running the engine
without a primed smoke
unit may cause damage
Smoke
Unit
Control
Add Smoke
3-Rail Pickups
2Rail/3Rail Operation
4