BL-2 Diesel Engine
4
Configuring Locomotive for 2-Rail or 3-Rail Operation
(As shown above, the 2Rail/3Rail switch is on the bottom of the chassis.)
Your locomotive can be configured to operate on 2-Rail or 3-Rail track. From the factory
the locomotive is configured to operate on 3-Rail Track. To configure the locomotive for
2-Rail track operation, please do the following:
1. Remove the center rail pickup roller assemblies as seen below.
2. Change the power input from 3-Rail to 2-Rail as seen above.
Add Smoke Fluid
2Rail/3Rail Switch
Содержание 20-20701-1
Страница 20: ...BL 2 Diesel Engine 20...
Страница 47: ...BL 2 Diesel Engine 47...