10
2
Unpacking and Installation
1
)
After unpacking the case, please read the operation manual carefully, and check
whether the components are enough according to the packing list.
2
)
Place the device steady, place more than 12h and then start debugging.
3
)
Keep well ventilated, the environment temperature should less than 35
℃
.
Note: Do not cover the air inlet/outlet!
4
)
Connect air outlet with vacuum device, connect air inlet with the device which need to
be vacuumized.
5
)
Before using the instrument, please clean the liquid on the surface of shell.
6
)
Do not use it outdoor.