
7 Maintenance
Maschinenfabrik Reinhausen GmbH 2020
48
4349312/01 EN
VACUTAP
®
VV
®
A label on the inside of the door of the TAPMOTION® ED motor-drive unit
also specifies the relevant maintenance interval.
Figure 21: Label showing maintenance intervals
Maintenance intervals with MR monitoring system
WARNING
Danger of explosion!
If pending maintenance work is not carried out immediately, this may lead to
death or serious injury as a result of a progressive short circuit, for example.
► Contact the Maschinenfabrik Reinhausen GmbH Technical Service de-
partment as soon as the MR monitoring system issues a maintenance
warning.
► In the event of failure or shutdown of the MR monitoring system, observe
the maintenance intervals as specified in the maintenance plan without
the MR monitoring system.
If you are operating the on-load tap-changer with an MR monitoring system,
the maintenance intervals displayed by the MR monitoring system shall ap-
ply. More information can be found in the operating instructions for the MR
monitoring system.
Содержание VACUTAP VV I 145kV
Страница 1: ...On load tap changer VACUTAP VV Operating Instructions 4349312 01 EN ...
Страница 65: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 65 4349312 01 EN VACUTAP VV 9 Drawings ...
Страница 77: ......
Страница 79: ......