
4 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
33
4349312/01 EN
VACUTAP
®
VV
®
4.1.2.2 Bleeding suction pipe on pipe connection S
1. Remove screw cap from pipe connection S.
Figure 20: Pipe connection S
2. Open vent screw and bleed piping.
3. Close vent screw.
4. Seal vent screw with screw cap.
4.1.3 Checking motor-drive unit
NOTICE
Damage to the on-load tap-changer / de-energized tap-changer!
Damage to the on-load tap-changer / de-energized tap-changer due to actu-
ation of the on-load tap-changer / de-energized tap-changer without insulat-
ing fluid.
► Ensure that the selector / de-energized tap changer is fully immersed in
insulating fluid and that the oil compartment of the on-load tap-changer is
completely filled with insulating fluid.
Содержание VACUTAP VV I 145kV
Страница 1: ...On load tap changer VACUTAP VV Operating Instructions 4349312 01 EN ...
Страница 65: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 65 4349312 01 EN VACUTAP VV 9 Drawings ...
Страница 77: ......
Страница 79: ......