Installation, Operating & Maintenance Manual

20

NOTE:  

The Time Clock controls boiler operation. The boiler is

on when the timer is on. The Blowdown Valve will open when the
timer turns the boiler off. See page 24 for Time Clock instructions

To provide for safe and low temperature blow-

down, and to comply with National and local plumbing and
building Codes, it may be necessary to blowdown into an ASME
Code blow-down separator tank, or to take other precautions to
prevent damage to building drain plumbing. Consult with a
licensed plumber.

Burn Hazard. Pressurized Steam and 

Hot Water is discharged during blowdown.

Duration Adjustment

Using a small flathead screwdriver, rotate the adjustment screw 
to the desired setting.

IMPORTANT:

Do not set less than 10 seconds. Do not force

screw past min and max stops, screw does not rotate more than 
300 degrees

Factory Recommended Settings:

The factory recommended setting for all CU boilers is 60 seconds
(100% turn).

1. Turn the override switch to permanent ON (I).
2. Turn the generator On/Off Switch to “ON”. On/Off Switch pilot

light and generator should be “ON”. Motorized drain valve 
should be closed. Auto blowdown light should be “OFF”.

3. Turn the override switch to permanent OFF (0). On/Off Switch

pilot light and generator should be “OFF”. Auto blowdown light
should be “ON”  Motorized drain valve remains open for 
approximately 60 seconds.

4. After 60 seconds: Motorized drain valve closes. Auto blowdown

light should be “OFF”. On/Off Switch pilot light and generator
remains “OFF”.

5. Turn the override switch to automatic (    ).

NOTE: ASME blowdown separator tank systems are 
available from Mr. Steam. For more information 
please contact Mr. Steam at 1-800-76 STEAM.

out 1     out 2   

˚

F

SET

WARNING

!

CAUTION

!

AUTOMATIC BLOWDOWN OPERATION & TESTING

DIGITAL1

® 

CONTROL OPERATING

PARAMETERS

• Operating Temperature range 100 – 120 °F (37.5 – 49 °C)
• Backup Temperature shut off fixed at 130 °F (54.5 °C).

SETTING OPERATING TEMPERATURE

1. Press the SET button twice, the light under OUT 2 will be on

and the display will be flashing.

2. Use the UP / DOWN arrows to set the temperature. 

Factory set at 100° F (37.5 °C).

3. Press the SET button again; the display will be solid and

showing room temperature (not pressing any button for 1
minute will also return the control to the room temperature).

NOTE: the control display remains on if the steam
bath generator switch is in the OFF position, however
power to the solenoids will be OFF.

60
sec

0
sec

30

sec

10 sec

Back

Содержание CU-1000

Страница 1: ...tors Installation Operation Maintenance Manual Models CU 360 through CU 4500 Installation Operation Maintenance Manual _______________________________________ IMPORTANT LEAVE THIS MANUAL WITH THE OWNE...

Страница 2: ...ass Installation 24 Water Gauge Gauge Glass Use and Care 25 24 hour and 7 day Time Switches 25 Trouble Shooting 26 Check PC Boards Probes Steam Solenoid Valve Digital 1 Control Heating Element 27 Elem...

Страница 3: ...authorized components acces sories or products on the generator or generator piping IMPORTANT The Mr Steam Digital 1 System operating and over temperature control is to be installed in accor dance wit...

Страница 4: ...only They are to be located indoors in a dry clean location and are not to be subjected to moisture conden sate hose wash down or the like 2 Do NOT install steambath generator outdoors or wherever env...

Страница 5: ...ble surfaces Refer to Fig 2 above for legend A 1 above top of CU generator B Front of CU generator suitable for alcove installation only D 1 from rear of CU generator EL 1 from left side of CU generat...

Страница 6: ...____ CU 1400 36 1400 3 8 1 20 30 38 300 _____________________________________________________________________________________________________ CU 2000 48 2000 1 2 1 24 33 44 330 _______________________...

Страница 7: ...to exceed 100 psig 5 Install a back flow preventor as required by Code 6 Provide anti water hammer device as required in accordance with Code 7 Provide unions as required to facilitate installation an...

Страница 8: ...am room enclo sure install each steam head 20 30 inches above the floor 2 Locate each steamhead away from bather seating area and away from traffic patterns as required to prevent incidental contact w...

Страница 9: ...______________________________________________________________________________________________ CU 1400 36 100 87 44 35 _________________________________________________________________________________...

Страница 10: ...th National Electric and local Codes Disconnect all power supplies at the main disconnect switch before proceeding 1 Electric wiring to the steambath generator must be in accordance with National Elec...

Страница 11: ...IMPORTANT Owners operators should obtain a copy and familiarize themselves with the latest edition of the American College of Sports Medicine Health Fitness Faculty Standards and Guidelines or a simi...

Страница 12: ...or more steam solenoid valves in parallel 2 When generator services two rooms second room requires a Digital 1 and Solenoid Valve s CONTROL CIRCUIT WIRING DIAGRAM Digital 1 Temperature Control System...

Страница 13: ...emperature Control System and optional automatic blowdown assembly For Models CU 1000AB3 CU 1000AC3 CU 1250AB3 CU 1250AC3 CU 1400AB3 CU 1400AC3 NOTES 1 Larger rooms may require two or more steam solen...

Страница 14: ...n the steam room at the location selected by the designer architect DO NOT LOCATE THE Digital 1 SENSORS NEAR OR ABOVE THE STEAM HEAD S AS THIS MAY CAUSE DIRECT STEAM EMISSION TO INTERFERE WITH STEAMRO...

Страница 15: ...ails including location of steam head s and sensors DIGITAL 1 KIT CONTENTS Mr Steam CU Steambath Generator can be used for one or two steam rooms in accordance with Page 5 Item D Each room requires on...

Страница 16: ...ove 4 diameter blank cover located on steam generator Mount the Digital 1 faceplate on the back of the generator cabinet with provided screws and nuts For one room installation use the upper blank 2 C...

Страница 17: ...EAR OR ABOVE THE STEAMHEAD S AS THIS MAY CAUSE DIRECT STEAM EMISSION TO INTERFERE WITH STEAMROOM TEMPERATURE REGULATION Route sensor cable directly to Digital 1 Control Do not route sensor cable with...

Страница 18: ...e the Operating Manual for the Digital Timer PUR 100383 for complete installation instructions NOTE All drawings are for illustrative purposes only Steam Vents CU AUTOFLUSH GRN WHT BLK BRN Blowdown Co...

Страница 19: ...he owner operator decreases below the set point the Digital 1 Control will energize the steam solenoid valve s and allow steam to enter the steam room Once the set temperature on the control is reache...

Страница 20: ...rain valve should be closed Auto blowdown light should be OFF 3 Turn the override switch to permanent OFF 0 On Off Switch pilot light and generator should be OFF Auto blowdown light should be ON Motor...

Страница 21: ...SAGE DISPLAY Under normal operation the actual room temperature will be displayed the following messages may also appear the Digital1 Control alarm will also sound press SET and DOWN simultaneously to...

Страница 22: ...under the age of 16 should not use this facility 3 Check with a doctor before use if pregnant diabetic in poor health or under medical care 4 Breathing heated air in conjunction with consumption of al...

Страница 23: ...cautions to prevent damage to building drain plumbing Consult with a licensed plumber NOTE ASME blowdown separator tank systems are available from Mr Steam For more information please contact Mr Stea...

Страница 24: ...n and illustrations MAINTENANCE INSTRUCTIONS To establish a good preventive maintenance pro gram we suggest that the site equipment fore man engineer or owner operator familiarize them selves with the...

Страница 25: ...is pointing directly upward Verify top and bottom fittings are threaded into the tapping the same number of turns dis tance A distance B 3 Remove glass packing nut friction washer or packing gland de...

Страница 26: ...ATER GAUGE GAUGE GLASS USE AND CARE D DO O N NO OT Ts s DO NOT use glass if it contains any scratches chips or any other visible signs of damage DO NOT reuse any tubular glass or glass packings DO NOT...

Страница 27: ...________________________________________________________________________________________ LWCO not functioning Check replace LWCO probe _________________________________________________________________...

Страница 28: ...robe threads and reinstall 6 After installation make sure probe is not touching ground With generator drained and probe wires disconnected there should be no resistance X between probe and ground Chec...

Страница 29: ...ge 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplied with replacement element Proceed to install element flange assembly with gasket between boiler flange and element...

Страница 30: ...r 7day AutoFlush Blowdown Clock optional Heating Elements Drain Valve Motorized AutoFlush Blowdown Valve On Off Switch Gauge Glass CU 360 CU 1400 TYPICAL COMPONENT ARRANGEMENT CU 2000 4500 with Digita...

Страница 31: ...______________________________________ 99314 Power Fuses 208 240V 60A 250V ________________________________________________________________________ 99317 Fuse Block 480V ______________________________...

Страница 32: ..._______________________________________________ 99290 Pressure Gauge 0 30 PS ______________________________________________________ 99969R HI LIMIT Ccontrol w Manual Reset 15PSIG _____________________...