GENERAL MAINTENANCE INFORMATION
ADJUSTMENT OF THE STEEL CABLES
- Your equipment may have some of these adjustments, to make the proper adjustment and tension of the steel cable just follow these points.
Maximum
Distance
2.5 cm
Tensioner
Locknut
Frieze
Maximum
Distance
2.5 cm
Steel cable
Screw
Locknut
Maximum
distance 5.5 cm
Maximum
distance
3.0 cm
Frieze
Load
multiplier
Locknut
Maximum
distance
2.5 cm
Screw
Locknut
Locknut
SHEAVE SET:
To adjust the sheave
set the screw must be locked with
the two nuts to avoid the set from
being release from the top plate,
use nuts also to make the proper
adjustment of the set.
11
Содержание EDGE ABDOMINAL
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ...Posicionamento do adesivo chart de instrução 8 50 mm 10 mm ...
Страница 9: ...9 ...
Страница 11: ...11 ...
Страница 15: ...15 22 Pesos Máximo EDGE ...
Страница 16: ... Maior Menor EDGE PLUS Porta treco 16 Menor ZA Carenagem ZC Suporte ZB Carenagem superior ...
Страница 17: ...17 ...
Страница 18: ...18 ...
Страница 20: ...MONTAGEM PASSO 4 MONTAGEM FIXAÇÃO DA CARENAGEM 20 PÁGINA 21 ...
Страница 21: ...21 ...
Страница 22: ...31 31 31 22 ...
Страница 23: ...23 ...
Страница 24: ... Menor Maior 17 E N 16 24 Distância Máxima 2 5 cm Tencionador Contra porca Friso Distância Máxima 2 5 cm ...
Страница 25: ...25 Figura 9 1 Figura 9 2 Figura 9 3 Figura 9 5 Figura 9 4 2 1 M ...
Страница 26: ...26 ...
Страница 27: ...27 ...
Страница 29: ...29 PASSO 13 MONTAGEM DA CARENAGEM E APOIO DO JOELHO 8x 4x 38 M4X12 38 38 ...
Страница 30: ...30 PASSO 14 MONTAGEM DOS ESTOFADOS Porca Sext M10 NOME Qtd 1x 36 Suporte NOME ZC 36 ZC 24 Pé NOME 37 37 27 20x ...
Страница 33: ...EDGE PLUS Porta treco D D 33 D PASSO 16 MONTAGEM DA CARENAGEM SUPERIOR D ...
Страница 36: ......
Страница 38: ......
Страница 43: ...7 STICKERS POSITIONS ON THE EQUIPMENT INSTRUCTIONS ...
Страница 44: ...8 STICKERS POSITIONS ON THE EQUIPMENT INSTRUCTIONS 50 mm 10 mm ...
Страница 62: ...STEP 10 ASSEMBLY THE WEIGHTS NAME NAME Weights Rods To assemble that we suggest 2 people 26 ASSEMBLY TOWER ...
Страница 74: ......
Страница 79: ...INSTRUCCIONES 7 Posición de los adhesivos en la máquina ...
Страница 80: ...INSTRUCCIONES 8 Posición de los adhesivos en la máquina 50 mm 10 mm ...
Страница 95: ...PASO 7 REGULACIÓN DEL PESO FRACCIONADO Nombre Nombre Herramientas Llave Fija 22 mm 23 MONTAJE TORRE ...