15
Cable Preparation and Installation
Cable and Gland Installation
To install the cables and glands, follow these steps:
Step 1:
Make a cable as specified in “Cable Preparation”. Plug in the RJ 45 into the ODU.
Step 2:
Support the drop cable and gently hand screw the gland body into the ODU until the
O ring seal is flush to the ODU body.
Caution:
Do not fit the back shell prior to securing the gland body.
Step 3:
Once the gland is fully hand screwed into the ODU it may be tightened to a torque
of 7 ftlbs/10Nm, with a 22mm wrench.
4Gon www.4Gon.co.uk [email protected] Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299