![Motorola OM 1000 Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/motorola/om-1000/om-1000_installation-and-operation-manual_245370028.webp)
Installation 3-5
Connecting the Optional Ground
Connect a ground wire from the OM 1000 to the rack frame using a #10-32 screw.
Connecting the Power Cable
Use only an AC-power cord that complies with the country’s product safety requirements.
CAUTION!
To prevent electrical shock, do not use the polarized power cord with an extension cord, receptacle, or other outlet
unless all blades can be fully inserted to prevent blade exposure.
Connect the AC-power cord
after
all I/O connections are complete. The power supply
automatically senses and adapts to any input from 85 through 264 Vac, at 47 through 63 Hz.
The OM 1000 meets all specifications with an AC input from 100 through 240 Vac, 50 through
60 Hz.
Confirming Correct Installation
After applying power to the OM 1000, there is short initialization period. If the installation is
correct, verify:
The green
POWER
indicator is on and the LCD displays the MAIN menu.
The
PLL ERROR
,
RF
ERROR
, and
FAULT SUMM
LEDs may illuminate red to indicate the RF
modulator is not set up in the INTFC menu and enabled in the PORT menu.
When the above sequence is observed, the unit can be configured. Refer to Section 4, “Setup and
Operation” for information on preparing the unit for operation. If the above conditions do not
occur, refer to Section 5, “Troubleshooting.”
OM 1000 Installation and Operation Manual