Mounting and bolt congurations
Chapter 4: Indoor GAP Hardware Installation
Installation on concrete
Concrete mounting is used in an outdoor GAP configuration. The same mounting can be used
for an indoor rack mounting on a concrete floor.
Due to the weight of the GAP cabinet, the supporting structure (concrete slab) must
be able to withstand at least 1000 lbs (500 kg).
Refer to
for a typical cross - section of the concrete bolt mounting to the GAP cabinet
or rack mounting brackets.
Figure 4-1
Concrete mounting
ti-cdma-05742-cnc.eps
CONCRETE
HILTI-BOLT
HSL-3M 8/20
LARGE FLAT
WASHER
MOUNTING
BRACKET
ISOLATION
PAD
(AFFIXED
TO
BRACKET)
OPTIONAL
ISOLATION
WASHER
PRELIMINARY ILLUSTRATION
Installation on wooden oor
Wooden floor mounting is typically used in an indoor GAP, rack mounting configuration.
4-6
68P09286A73-1
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Содержание MOTOwi4 25600
Страница 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 49: ...Unpacking Chapter 2 Site Preparation 2 14 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 57: ...Cable Lengths Chapter 3 Cable Descriptions 3 8 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 85: ...GAP Cabinet cabling Chapter 6 Optional Equipment 6 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 95: ...Installation checklist Chapter 8 XXXXXXXXXXXX 8 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 97: ...Installation checklist Chapter 9 XXXXXXXXXXXX 9 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 99: ...Installation checklist Chapter 10 XXXXXXXXXXXX 10 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 101: ...Installation checklist Chapter 11 XXXXXXXXXXXX 11 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 102: ...Appendix A Alternate RF Head Installation Procedure 68P09286A73 1 A 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 104: ...Appendix B Alternate RGPS Installation 68P09286A73 1 B 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...