Ground Based Access Point (GAP) Hardware Installation
Unpacking
Unpacking
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
This section describes unpacking the various units for the GAP.
GAP equipment
The GAP equipment is shipped either as and indoor unit and as an outdoor unit. The indoor unit
includes the BCU and TRX cages and is designed to fit in a standard 19–inch rack. The outdoor
unit is comprised of two outdoor cabinets, the BTS and BBU. Both the BTS and BBU cabinets are
pre-configured per order, and shipped with the internal cabling included.
Outdoor GAP
Installation of the two outdoor cabinets (BTS and BBU) mainly consists of mounting the unit,
grounding cabling, main power cabling, cabling between cabinets and cabling between the
TRX modules and the RF antennas.
68P09286A73-1
2-11
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Содержание MOTOwi4 25600
Страница 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 49: ...Unpacking Chapter 2 Site Preparation 2 14 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 57: ...Cable Lengths Chapter 3 Cable Descriptions 3 8 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 85: ...GAP Cabinet cabling Chapter 6 Optional Equipment 6 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 95: ...Installation checklist Chapter 8 XXXXXXXXXXXX 8 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 97: ...Installation checklist Chapter 9 XXXXXXXXXXXX 9 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 99: ...Installation checklist Chapter 10 XXXXXXXXXXXX 10 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 101: ...Installation checklist Chapter 11 XXXXXXXXXXXX 11 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 102: ...Appendix A Alternate RF Head Installation Procedure 68P09286A73 1 A 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 104: ...Appendix B Alternate RGPS Installation 68P09286A73 1 B 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Страница 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Страница 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...