![Motorola MOTORAZR2 V8 Скачать руководство пользователя страница 55](http://html.mh-extra.com/html/motorola/motorazr2-v8/motorazr2-v8_service-manual_243674055.webp)
6809515A95-O
July 18, 2007
55
Level 1 and 2 Service Manual
Disassembly
3.
Protect the light sensor and hall effect sensor on the new K-Flex by covering
them with insulating tape. Do not place the tape on the pink portion of the K-
flex (see Figure 45).
4.
Guide the connector through the housing opening during assembly. Use
extreme care when bending the flex.
5.
Pre bend the left element to a 90 degree angle.
6.
Insert the K-flex connector and left element into the front housing.
7.
Peel away the liner on the right side of the K-flex.
8.
Bend the right element to a 90 degree angle.
v462522
Figure 45. Protecting the K-Flex Sensors
v462528
Figure 46. Bending the K Flex Left Element
Light sensor
Hall effect sensor
Pre bend element to 90 degree angle
Содержание MOTORAZR2 V8
Страница 1: ...Level 1 and 2 Service Manual 6809511A13 O MOTORAZR2 V8 GSM 850 900 1800 1900 MHz EDGE GPRS ...
Страница 4: ...4 July 18 2007 6809515A95 O Contents MOTORAZR 2 V8 ...
Страница 20: ...20 July 18 2007 6809515A95 O General Operation MOTORAZR 2 V8 ...
Страница 82: ...82 July 18 2007 6809515A95 O Troubleshooting V8 Exploded View Diagram v463245 Figure 78 Exploded View Diagram ...
Страница 90: ...90 July 18 2007 6809515A95 O Troubleshooting V8 ...
Страница 93: ......
Страница 94: ......