6
4. Installation dimensions
Determine the position of the gate motors on the gate leaf and
gate post, taking care to avoid any obstacles such as walls,
fences or plants etc
Where possible, keep the difference between X and Y to 40mm
to avoid jerky movement and speed variations
Greater opening angles are possible by reducing dimension Y
and increasing dimension X
Motor
Opening Angle 95°
Opening Angle 120°
W
X
Y
Z
W
X
Y
Z
WING 300 930 140 140 370 930 170 120 370
WING 400 1130 185 185 270 1130 250 130 470
WING 600 1540 280 280 670 1540 350 140 670
5. Installation
1 - Once the geometry and has been calculated install the Ram mounting bracket to the pier or gate
post. The bracket can be fixed using suitable coach screws, masonry fixings, or it can be cut and
welded to a metal post. Ensure that the bracket is installed horizontally.
See Fig. 09 and Fig.10
2 - Mount the Ram motor onto the rear bracket and secure in place with the pin and grub screw
provided, as Fig 11