Fig. 07
Fig. 08
7.1. Preliminary checks
To ensure safety and an efficiently operating automated system, make sure the following
conditions are applied:
- The structure of the gate must be suitable for being automated. In particular, check that the
structure is sufficiently strong and rigid, and that its dimensions and weight conform to those
indicated in the technical specifications;
- Make sure that the gate slides without any inclination;
- Make sure that the gate moves uniformly and correctly, without any irregular friction during its
entire travel;
- The soil must permit sufficient stability for the expansion plugs securing the foundation plate;
- Remove any locks and lock bolts. We advise you to have any metalwork carried out before the
automated system is installed.
7.2. Preparing the foundation plate
Fit the 4 supplied nuts, as shown in Fig. 07 and Fig. 08, in the 4 holes of the plate.
7.3. Preparing the foundation plate
7) INSTALATION
Pág. 05
58
90º
90º
Fig. 09a
Fig. 09b
a) The foundation plate must be located as shown in Fig. 9 a (right closing) or Fig. 9b (left closing)
to ensure the rack and pinion match correctly.