MOS OPT100 Скачать руководство пользователя страница 8

8.

Oxygen Sensor Exchange / Repair

SENSOR EXCHANGE:

Sensor is packed with its cover to keep its electrolyte in passive mode. Open the sensor cover just
before 24 hours of installation and keep it at ambient condition that will operate. Passive electrolyte
will get active with this way and start to measure correctly after installation into the OPT100 panel. Do
not forget to note sensor installation date onto the panel. Please check SENSOR CALIBRATION part
for new sensor calibration.

Sensor date code:

 

②⑦①③

Week 

Year (2013)

SENSOR REPAIR:

Do  not  open  the  sensor  for  any  repair  attempt.    There  isn’t  any  repairable  part  inside  the
sensor and it will be damaged permanently. Inner Electrolyte can also create severe irritation
on skin.

8

Содержание OPT100

Страница 1: ...INSTRUCTION MANUAL OPT100 Oxygen Monitor...

Страница 2: ...ressure Compensation 811 mPA 1216mPA Signal Output Analog 4 20 mA programmable Galvanic Isolation 2000 VAC optokupler Line Resistance 1K2 Ohms 2 Sensor lifetime vary with the operating conditions It i...

Страница 3: ...g installation Location should be selected carefully to prevent any direct air flow to the Monitor from other machinery and or ventilation Do not install the unit nearby any heat source 1 Electrical c...

Страница 4: ...wer should be turned on after finishing the installation completely Remove the electric connection part cover Pay caution to the data cable in between cover and the box and remove this cable from its...

Страница 5: ...ET SET 209 o2 SET Adjust HIGH Alarm value with up and down buttons You can set it in between 5 0 to 30 00 aLrL 250 Low O2 alarm value can be set with ALRL parameter Press button Press button Press but...

Страница 6: ...ow mentioned steps 1 Connect calibration fitting into N2 bottle 99 9 N2 with pneumatic hose 2 Connect calibration fitting into the O2 sensor via installing into the sensor inlet 3 Open the N2 bottle v...

Страница 7: ...ously Be sure that Calibration fitting is connected to the sensor and N2 bottle valve is opened with 99 9 N2 gas supply to the sensor After reaching to 0 value press SET button and stop the gas supply...

Страница 8: ...active with this way and start to measure correctly after installation into the OPT100 panel Do not forget to note sensor installation date onto the panel Please check SENSOR CALIBRATION part for new...

Страница 9: ...nsor is damaged or expired If value stay constant consult supplier Panel screen isn t working Please check the cable and its socket in between front panel and mainboard and be sure its properly connec...

Отзывы: