MOS OPT100 Скачать руководство пользователя страница 3

3.

Mechanical Dimensions

198 mm

191 mm

1

2

3

4

5

6

7

3

Oxygen value as %

Led display

Keypad. For adjustment and parameter exchange.

Siren and flasher

Oxygen  Sensor

Cable Inlets

Cable Inlet Part Cover

Sensor inlet should be covered for dust and
particle penetration during installation.
Location should be selected carefully to
prevent any direct air flow to the Monitor
from other machinery and / or ventilation.
Do not install the unit nearby any heat source.

1. Electrical connections should be started after finishing the installation.

Monitor can easily be connected to the wall with installation fittings that are inside the package.
After deciding proper location, you can drill the wall. Monitor will be installed and screwed accordingly.

Содержание OPT100

Страница 1: ...INSTRUCTION MANUAL OPT100 Oxygen Monitor...

Страница 2: ...ressure Compensation 811 mPA 1216mPA Signal Output Analog 4 20 mA programmable Galvanic Isolation 2000 VAC optokupler Line Resistance 1K2 Ohms 2 Sensor lifetime vary with the operating conditions It i...

Страница 3: ...g installation Location should be selected carefully to prevent any direct air flow to the Monitor from other machinery and or ventilation Do not install the unit nearby any heat source 1 Electrical c...

Страница 4: ...wer should be turned on after finishing the installation completely Remove the electric connection part cover Pay caution to the data cable in between cover and the box and remove this cable from its...

Страница 5: ...ET SET 209 o2 SET Adjust HIGH Alarm value with up and down buttons You can set it in between 5 0 to 30 00 aLrL 250 Low O2 alarm value can be set with ALRL parameter Press button Press button Press but...

Страница 6: ...ow mentioned steps 1 Connect calibration fitting into N2 bottle 99 9 N2 with pneumatic hose 2 Connect calibration fitting into the O2 sensor via installing into the sensor inlet 3 Open the N2 bottle v...

Страница 7: ...ously Be sure that Calibration fitting is connected to the sensor and N2 bottle valve is opened with 99 9 N2 gas supply to the sensor After reaching to 0 value press SET button and stop the gas supply...

Страница 8: ...active with this way and start to measure correctly after installation into the OPT100 panel Do not forget to note sensor installation date onto the panel Please check SENSOR CALIBRATION part for new...

Страница 9: ...nsor is damaged or expired If value stay constant consult supplier Panel screen isn t working Please check the cable and its socket in between front panel and mainboard and be sure its properly connec...

Отзывы: