background image

Morsø S81

MORSØ JERNSTØBERI A/S . DK-7900 NYKØBING MORS

MORSØ JERNSTØBERI A/S . DK-7900 NYKØBING MORS

E-Mail: [email protected] · Website: www.morsoe.com

E-Mail: [email protected] · Website: www.morsoe.com

 

DK  Opstillings- og betjeningsvejledning

 

UK  Instructions for installation and use

Содержание S81 Series

Страница 1: ...7900 NYK BING MORS MORS JERNST BERI A S DK 7900 NYK BING MORS E Mail info morsoe com Website www morsoe com E Mail info morsoe com Website www morsoe com DK Opstillings og betjeningsvejledning UK Inst...

Страница 2: ...lation af Deres Mors ovn 5 2 0 Fyringsteknik Brugen af Deres ovn 14 3 0 Regelm ssig vedligeholdelse af ovnen 17 4 0 Tekniske data 18 UK 1 0 Installing your Mors stove 23 2 0 Firing using the stove 32...

Страница 3: ...3 MORS JERNST BERI A S DK 7900 NYK BING MORS E Mail info morsoe com Website www morsoe com Opstillings og betjeningsvejledning S81 EN 13229...

Страница 4: ...i sikre p at De ogs vil f nytte og gl de af Deres nye ovn i mange r Pr vningsattest skal f lge ovnen Den danske Br ndeovnsbekendg relse tr dte ikraft den 1 januar 2008 I forbindelse med indf relsen af...

Страница 5: ...installationen og der aftales fejningster miner Hvis skorstenen ikke har v ret i brug i nogen tid b r den unders ges for revnedan nelser fuglereder m v inden den igen tages i brug 1 4 Ovnens placerin...

Страница 6: ...6 S81 90 installeret i eksisterende murv rk...

Страница 7: ...sage revnedannelse i den ildfaste m rtel Det er derfor vigtigt at bruge en murb sning og t tningssnor Hvis der ikke i forvejen er en renselem som vist p skitserne kan det v re en fordel at mon tere en...

Страница 8: ...ingshuller Indl bshullet skal som minimum have et areal p 105 cm og skal placeres i niveau under indsatsen Luften der kommer igennem indl bshullet skal kunne passere op og forbi ind satsen Udl bshulle...

Страница 9: ...9 Isoleret st lskorsten Ubr ndbar plade Gasbetonsten Ventilations bning 140 cm Ventilations bning 105 cm S81 90 installeret i specialbygget pejsemilj...

Страница 10: ...10...

Страница 11: ...ende skorstensforing med den rigtige diameter Herved opn s et for get tr k og tillige en bedre fyrings konomi Der stilles ingen krav til nogen bestemt skorstensh jde men den skal v re s h j at tr k fo...

Страница 12: ...jninger end n dvendigt og begr ns r gr rsl ngden da tr kfor holdene ellers neds ttes Frisklufttilf rsel En br ndeovn kr ver luft til forbr ndingen Dette bevirker at br ndeovnsfyring er med til at give...

Страница 13: ...h j Eksempelvis om sommeren Det er vindstille Skorstenen ikke har den rette h jde s den er i l af tagflade og h je tr er I disse tilf lde er der ogs st rst risiko for r gnedslag Der kommer falsk luft...

Страница 14: ...dige m ngde ilt luftm ngde Indstilling af lufttilf rsel opt ndingsmetode og fyringsintervaller er afh ngig af skorstenstr k vind og vejrforhold varmebehov br ndsel m m Derfor kan der g tid inden De ke...

Страница 15: ...nnes ved opt nding med 1 5 2 0 kg tr samt et par opt ndingstabletter efter f lgende metode Ovenp et par st rre k vler 0 25 0 50 kg placeres en stablet bunke sm pinde Under de verste pinde anbrin ges o...

Страница 16: ...m fejlbetjening af ovnen eller l ngere tids an vendelse af fugtigt br ndsel lukkes lufttilf rslen helt og brandv snet kontaktes Sammenligning tr fyring og olie Tr art vandindhold p 20 Antal rummeter p...

Страница 17: ...te glas ikke havner som almindelig genbrug Det er til stor hj lp for milj et OBS Skal afleveres som keramisk glas p en genbrugsstation Indvendige st bejernsdele og andre sliddele Vermiculite sten og a...

Страница 18: ...ortskaffes med dagrenovationen Da der kan ligge gl der gemt i askeskuffen i flere d gn kan det v re n dvendigt at opbevare asken i en beholder af ubr nd bart materiale inden asken h ldes i affaldss kk...

Страница 19: ...cessen Derfor giver MORS 5 RS GARANTI med hensyn til materiale og fabrikationsfejl Garantiperioden regnes fra salgsdato For at sikre bedst mulig garantibehandling anbefales det at udfylde garantikorte...

Страница 20: ...20...

Страница 21: ...21 MORS JERNST BERI A S DK 7900 NYK BING MORS E Mail info morsoe com Website www morsoe com Instructions for installation and use S81 EN 13229...

Страница 22: ...ntrol area It is also an offence to acquire an unauthorised fuel for use within a smoke control areaun less it is used in an exempt appliance exempted from the controls which generally apply in the sm...

Страница 23: ...ot been used for some time it should be inspected for cracks bird nests etc before it is used 1 4 Location of the stove distance requirements The requirements to the placement of the stove and the sep...

Страница 24: ...24 S81 90 connected to existing masonry chimney...

Страница 25: ...ctory mortar A thermal ex pansion of the flue pipe may cause cracking of the refractory mortar Therefore it is impor tant to use a wall bushing and sealing cord If there is no cleaning door as shown i...

Страница 26: ...entry hole with a surface of at least 350 cm2 must be placed at a level under the insert The air that enters through the entry hole must be able to flow freely up past the insert An exit hole with a s...

Страница 27: ...27 Insulated steel chimney Nonflammable sheet slab Cellular concrete min 100 mm Ventilation hole 140cm Ventilation hole 105 cm S81 90 connected to custom built fireplace structure...

Страница 28: ...28...

Страница 29: ...will mean that too much energy will be required to heat the chimney sufficiently to achieve an acceptable draught If you have a brick chimney with a large aperture we recommend that you install an ins...

Страница 30: ...NOT BEAR THE WEIGHT OF THE CHIMNEY SYSTEM See chimney man ufacturer s instructions Excessive weight on the stove will inhibit expansion and could lead to damage of the stove top Damage caused to the...

Страница 31: ...weather conditions The draught will be reduced when The temperature difference is too low e g in connection with a poorly insu lated chimney If the chimney is cold it may help to light burn up a rolle...

Страница 32: ...the draught in the chimney the wind and weather the amount of heat required the fuel etc This means that it may take some time before you get to know the correct functioning of the stove under any giv...

Страница 33: ...thod Place two logs each weighing 0 25 0 5 kg on the bottom grate Next place approximately 0 5 kg dry kindling on top of the logs Just beneath the top of the kindling place the firestarters Ignite the...

Страница 34: ...ing fired vigorously Refuelling on to a low fire bed If there is insufficient burning material in the firebed to light a new fuel charge excessive smoke emission can occur Refuelling must be carried o...

Страница 35: ...ill be poor The stove provides too much heat so the combustion should be reduced But always remember to make sure that there are lasting flames until the wood be comes charcoal If you want a weaker fi...

Страница 36: ...o long that they press against the glass window when the door is closed Ceramic glass replacement Ceramic glass cannot be recycled because it has a higher melting point that ordinary glass If ceramic...

Страница 37: ...ings after having consulted you Ash As noted above there should be a layer of approximately 1 cm insulating ash in the bottom of the combustion chamber in order to achieve a high combustion temperatur...

Страница 38: ...38...

Страница 39: ...detailed measures have been put into place at all key stages of the build Accordingly provided that the stove has been supplied by an authorised Mors dealer Mors will offer a 5 Year Manufacturers Gua...

Страница 40: ...r ggasser ne med risiko for s vel materielle skader som personskader Indfyring Ved ny indfyring brug 2 3 stk br nde maks 2 2 5 kg S rg for rigelig luft Dvs klare og gule flammer Fyr aldrig over om nat...

Отзывы: