Operation
48
The amount of time between a green SOC indication and
load disconnect will depend on many factors including:
• rate of discharge (amount of load draw)
• capacity of the battery
• health of the battery
• LVD set-point
If the battery discharges to the LVD set-point the load will
disconnect and a solid red Battery Status LED indication will
be displayed.
General Load Control Notes:
Do not wire multiple ProStar MPPT load outputs together in
parallel to power DC loads with a current draw greater than
25 or 30A, depending on the ProStar MPPT model in use.
Equal current sharing cannot be assured and an over-load
condition will likely occur on one or more controllers.
Exercise caution when connecting loads with specific
polarity to a live load circuit. A reverse polarity connection
may damage the load. Always double check load
connections before applying power.