MORA-TOP 100 NTR/HV Скачать руководство пользователя страница 10

After connection of the heater to the eater mains, hot water heating system, el. network and after testing of the 
pressure   relief   valve   (according   to   the   instructions   that   came   with   the   valve),   the   heater   can   be   set   into 
operation.

Procedure:

a) Check the water mains, electrical installation and in the case of combined heaters also the installation 

for the hot water heating system. Check to the correct positioning of the sensors for the operational 
thermostats. The sensors must be pushed all the way into the chamber as far as they will go.

b) Open the hot water valve on the mixer tap
c) Open the valve in the inlet pipe for cold water to the heater
d) As soon as water begins to spill out of the valve for hot water, filling of the heater is complete and the 

valve should be closed

e) If any leak is apparent (the flange lid), we recommend you tighten the screws on the flange lid
f) Screw on the cover for the electrical equipment
g) When operating heating of utility water using heat energy from the hot water heating system, open the 

valves at the inlet and outlet for heating water and if necessary vent the exchanger

h) On setting the heater into operation, flush out the heater until the cloudiness has disappeared.

11.      CLEANING THE HEATER AND REPLACEMENT OF THE ANODE BAR

Through repeated heating of water, lime scale is deposited on the walls of the vessel and above all on the lid of 
the flange.
The level of deposit is dependent on the hardness of the heated water, its temperature and on the amount of hot 
water consumed.
          

We recommend a check and if necessary cleaning of the lime scale from the vessel after two years of 

operation as well as replacement of the anode bar if necessary

. The life span of the anode is theoretically 

calculated for two years of operation although this does vary depending on the hardness and chemical 
composition of the water in the location where the heater is used. It is possible to determine the date for next 
replacement of the anode bar on the basis of this inspection. Leave cleaning and exchange of the anode to a 
company, which performs service work. When releasing water from the heater, the valve on the mixer tap for 
hot water must be open so no low air pressure is created in the heater vessel, which would restrict the water 
from escaping.

12.     IMPORTANT NOTICE

-

The MG anode must be regularly checked and replaced

-

There must be no stop valve fitted between the heater and the pressure relief valve.

-

In the event of excess pressure in the water mains in excess of 0.6 MPa a reduction valve must be fitted 
before the pressure relief valve.

-

All outlets for hot water must be fitted with mixer taps.

-

Before water is allowed into the heater for the first time, we recommend a check is made on the tightness of 
the nuts on the flange joints of the vessel.

-

Any handling of the thermostat apart form setting of the temperature using the control dial is forbidden.

-

All work on the electrical equipment, setting and replacement of regulation elements must be performed by 
a professional service business.

Disposal of packaging material

       A service charge has been paid for the packaging in which the water heater 

Содержание 100 NTR/HV

Страница 1: ...Operation and installation manual STORAGE WATER HEATERS WITH INDIRECT HEATING MORA TOP 100 NTR HV MORA TOP 125 NTR HV MORA TOP 160 NTR HV...

Страница 2: ...nt functional defects and their causes 11 16 Product accessories 12 Illustrations 12 Table of technical data 13 Heater dimensions 14 Type of environment We recommend use of the product in an internal...

Страница 3: ...exchangers the option to use two sources of heating water or through their interconnection to gain double the exchange surface of the exchanger Light signalling of heater operation Precise control of...

Страница 4: ...meter 8 Circulation 9 Mg anode 10 Discharge hole Inlet for heating water Inlet for cold water Circulation Outlet for HUW Outlet for heating water Inspection hole with anode Cover for electrical equipm...

Страница 5: ...rsal design fitting of a shut off valve to the heating insert from the right or the left fig 1 5 OPERATION Operating controls for heaters with volumes of 50 to 160L are located under the see through c...

Страница 6: ...ermostat Restriction of regulation pull off the thermostat dial this will be quite difficult the first time You will find two 2 15mm cylindrical pegs on the reverse side Pull out one peg and insert it...

Страница 7: ...break device is displayed by water flowing out via the waste water spout on the pressure relief valve During regular operation this check must be carried out at least once a month and always after th...

Страница 8: ...xpansion vessel is not a condition for correct connection only an alternative solution Connection of exchangers in series Two sources of heating water HEATING WATER COLD WATER CIRCULATION RETURN WATER...

Страница 9: ...cking of the water temperature also controls for a remote bulb thermostat for setting of the required temperature and two signal lights green to show that the heater is heating and orange to show that...

Страница 10: ...temperature and on the amount of hot water consumed We recommend a check and if necessary cleaning of the lime scale from the vessel after two years of operation as well as replacement of the anode ba...

Страница 11: ...afety equipment for central heating and heating of hot utility water b Concerning the electrical network SN 33 2180 Connection of electrical equipment and appliances SN 33 2000 4 41 Electronic equipme...

Страница 12: ...on to the cold water feed must correspond to SN 060830 Technical data Water heater pressure and heat loss TYPE FLOW OF HEATING WATER l h PRESSURE LOSS mbar kW 24h OKC 100 NTR 0 9 OKC 125 NTR 1 05 OKC...

Страница 13: ...32000 Heating time with exchagner from 10 to 60 C min 14 14 17 Heat loss kWh 24h 0 9 1 1 1 39 Heater dimensions MORA TOP 100 NTR MORA TOP 125 NTR MORA TOP 160 NTR MORA TOP 200 NTR MORA TOP 250 NTR MO...

Страница 14: ...heater to the end of the w ater inlet and outlet pipes OKC 160 NTR HV A 129 B 73 R 204 DISCHARGE HOLE OUTLET FOR HUW DISCHARGE HOLE OULET FOR HEATING WATER INLET FOR COLD WATER CIRCULATION OUTLET FOR...

Страница 15: ...76 1041 1230 C 615 636 801 1005 D 211 261 261 261 E 551 551 831 F 501 701 701 651 701 G 3 4 1 1 3 4 1 H 3 4 3 4 3 4 Height from low er edge of the heater to the end of the w ater inlet and outlet pipe...

Страница 16: ...A 1200 1300 B 855 870 C 81 81 D 571 671 E 240 240 All inlets and outlets have an internal G 3 4 thread Type OKCV 125 OKCV 160 A 1046 1235 B 600 700 C 908 1008 D 225 225 E 281 230 F 440 671 All inlets...

Отзывы: