background image

PVVEX58-300 & PVVEX510-300 Horizontal Power Vent

Page 13

XG0518 - 070714

Step 12:  

Zap strap wires together in a neat bunch so that no wires 

can fall into the motor. 

Figure 5k.

 

Step 13:  

Zap strap wires to loop in the top of the capacitor. 

Figure 5l.

 

Step 14:  

Test the power vent and make sure it is working properly. 

When looking down at the top of the motor the fan should be spinning 

counterclockwise. If it is spinning the wrong way or not at all it is wired 

incorrectly. Put the top cover back on using the supplied replacement 

screws. 

Top Cover

Top Cover

Screws x 4 plcs

Screw Locations

x 4 plcs

Wind Baffle

Rain Skirt

Screw Locations

x 5 plcs

Top Separator

Step 1:

a) Remove the 4 outer screws 

that fasten the Top Cover to 

the termination

b) Remove the Cover.

PVVEX58-300 

Motor Removal / Servicing

Step 2:

a) Remove the 4 outer screws 

that fasten the Wind Baffle to 

the termination.

b) Lower the Wind Baffle to 

rest on the Rain Skirt.

Step 3:

a) Remove the 5 outer screws 

that fasten the Top Separator 

to the termination.

b) Remove the Top Separator.

Figure 5m.

 

Service

Содержание PVVEX510-300

Страница 1: ...plosion risk Oxidising Danger of death Biohazard Laser Radiation Danger of entrapment Hot surface General Warning Blank Gas bottles Watch for falling objects Electricity Danger for cutter Entrapment hazard Battery hazard Rotating parts Low temperature Strong magnetic field Optical radiation Non ionizing radiation Radiation Hazardous to the Environment Danger of harming your hands Irritant Cutting ...

Страница 2: ...arness EPVH20 20 foot power cord and harness EPVH30 30 foot power cord and harness EPVH40 40 foot power cord and harness EPVH50 50 foot power cord and harness EPVH60 60 foot power cord and harness EPVH70 70 foot power cord and harness EPVH80 80 foot power cord and harness EPVH90 90 foot power cord and harness EPVH100 100 foot power cord and harness Specifications Before Your Begin For vent configu...

Страница 3: ...4 610 PVVEX58 300 Vertical Po 8 3 8 66 4 10 17 432 17 432 5 126 8 202 ical Power Vent Termination 18 3 8 466 10 1 2 267 6 7 8 174 16 1 2 419 24 610 17 432 17 432 126 PVVEX58 300 PVVEX510 300 Horizontal Power Vent 18 3 8 466 16 1 2 419 24 610 24 610 5 126 8 202 PVVEX58 300 Vertical Power Vent Termination Bottom View Introduction Page 3 XG0518 070714 ...

Страница 4: ...orizontal Power Vent Page 4 XG0518 070714 16 1 2 419 18 3 8 466 6 7 8 175 13 330 24 610 24 610 18 458 18 458 5 126 10 253 PVVEX510 300 Vertical Power Vent Termination Figure 1a PVVEX58 300 PVVEX510 300 Tolerance mm Installation ...

Страница 5: ...m municate with the Power Vent Run vent pipe from the fireplace to the chase Make sure the last section is female end up and is flush with the top of the chase without going above it See figure 2b Figure 2b Installing the Rough in Kit Figure 2c Installing the Rough in Kit 20 Max 20 Max PVVEX58 300 10 5 8 270 Min 10 5 8 270 Min 24 Min PVVEX510 300 13 330 Note Follow local and or national code requi...

Страница 6: ...ews securing strain relief plate and remove it Strain Relief Plate Figure 2g Step 6 Loosen nut on the strain relief of the control cable Pass control cable through slot in rough in box making sure the nut stays is on the opposite side of the rough in box as the strain relief Figure 2h Step 7 Push the strain relief through the hole in the roughin box Figure 2i Step 8 Reinstall the strain relief pla...

Страница 7: ...the electrical harness EPVH 10 100 that will communicate with the Power Vent module Step 3 Install the power vent Rought in Kit Remove the electrical cover plate from inside of the rough in kit Pull the control cable through the slot in the bottom of the box and insert the plug into the rectangular hole in the cover plate Re attach the cover plate Pull wire harness throught the supplied hole in th...

Страница 8: ...of water or moisture Attachment screw locations Attachment screw locations Step 16 Place power vent over chase and fasten with 4 screws on the vertical sides of the base plate Silicone of seal the base plate in any location necessary to keep the structure of the building free of water or moisture Conduit Wiring clearances Connect the power vent harness as outlined Connect the wiring to the firepla...

Страница 9: ...PVVEX58 300 PVVEX510 300 Horizontal Power Vent Page 9 XG0518 070714 Figure 4 Power Vent Wiring Diagram C Power Vent Wiring BLUE BROWN BLACK WHITE BLACK GREEN 6 PIN MOLEX CONNECTOR KEY WAY Installation ...

Страница 10: ...inches 30 inches I clearance to inside corner 30 inches 30 inches J clearance to each side of the vertical centerline of a metre or regulatory assembly to a maximum vertical distance of 15ft 3 feet 3 feet K clearance to service regulator vent outlet 3 feet 3 feet L clearance to non mechanical air supply inlet to the building or combustion air inlet to other appliance for appliance 100 000 BTU H 30...

Страница 11: ...the 4 outer screws that fasten the top cover to the termination Remove the cover Figure 5 Capacitor Replacement REC1252 Turn off power and gas before servicing Figure 5a Step 2 Cut zap straps Step 3 Unscrew ground wire capacitor bracket from motor WARNING Save this screw Figure 5b Step 4 Cut brown wire from motor and black wire from capacitor Figure 5c Step 5 Cut black fibre wire from power cable ...

Страница 12: ...citor and ground wire to the motor using the existing screw you saved Figure 5g Step 9 Using a small bell connector connect the blue wire from the motor to the black fibre wire from the power cable Figure 5h Step 10 Using the large bell connector attach the white fibre wire from the power cable to the black wire from the motor and a black wire from the capacitor Figure 5i Step 11 Using the other s...

Страница 13: ...y or not at all it is wired incorrectly Put the top cover back on using the supplied replacement screws Top Cover Top Cover Screws x 4 plcs Screw Locations x 4 plcs Wind Baffle Rain Skirt Screw Locations x 5 plcs Top Separator Step 1 a Remove the 4 outer screws that fasten the Top Cover to the termination b Remove the Cover PVVEX58 300 Motor Removal Servicing Step 2 a Remove the 4 outer screws tha...

Страница 14: ...nd baffle to the termination Lower the wind baffle to rest on the rain skirt Top Cover Top Cover Screws x 4 plcs Screw Locations x 4 plcs Wind Baffle Rain Skirt Screw Locations x 5 plcs Top Separator s ng s to s or r Figure 6a Step 3 Remove the 5 outer screws that fasten the top separator to the termination Remove the top separator Top Cover Top Cover Screws x 4 plcs Screw Locations x 4 plcs Wind ...

Страница 15: ...otor mounting plate Figure 6g Figure 6h Step 9 Lift out motor and capacitor REC1253 Figure 6i Step 10 Drop new motor assembly into the power vent and screw with supplied 4 screws and star washers Line up cut out in motor mounting plate with electrical conduit Figure 6j Step 11 Remove the ground wire screw from the motor NOTE Save this screw for later Figure 6k Service ...

Страница 16: ...black wire from the motor and one of the black wires from the capacitor Figure 6m Step 14 Using a small bell connector connect the black fibre wire from the power cable to the blue wire of the motor Figure 6n Step 15 Using the other small bell connector connect the other black wire from the capacitor to the brown wire from the motor Figure 6o Step 16 Using a zap strap to bundle the wires neatly to...

Страница 17: ... Step 21 Test the power vent and make sure it is working properly When looking down at the top of the motor the fan should be spinning counterclockwise If it is spinning the wrong way or not at all it is wired incorrectly Put the top cover back on using the supplied replacement screws Top Cover Top Cover Screws x 4 plcs Screw Locations x 4 plcs Wind Baffle Rain Skirt Screw Locations x 5 plcs Top S...

Страница 18: ...by The Companies 2 The Montigo Gas Appliance must be subjected to normal use The Gas Appliances are designed to burn gas only Burning conventional fireplace fuels such as wood coal or any other solid fuel will cause damage to the Gas Appliance will produce excessive temperatures and will result in a fire hazard Limitations On Liability It is expressly agreed and understood that The Companies sole ...

Страница 19: ...imum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not ...

Страница 20: ...Ferndale Washington TF 1 800 789 6236 FX 1 866 3000 0927 XG0518 070714 Langley British Columbia TF 1 800 378 3115 FX 1 604 607 6462 PVVEX58 300 PV VEX510 300 Power Vent Termination ...

Отзывы: