M40DV-ST See-Thru Gas Fireplace
Installation
Installing Heat Guards over Terminations
1. Ensure that the two
long
mounting brackets are facing the bot-
tom of the termination. (See inset). This will provide more heat
protection at the top of the termination, where temperatures are
highest.
2. Attach to the faceplate of the termination using four sheet metal
screws.
Installing Terminations with MSR Frames
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
12
12
MSR
Figure 4b. Installing a PT0-3 termination with the MSR frame.
Figure 4c. Installing a PT0-3 termination with the MOSR frame.
12
12
12
MOSR
Installing Terminations with MOSR Frames
1. Frame the termination opening to 12" x 12".
2. Fasten the MSR frame to the interior side of the studs using a
minimum of 4 screws.
3. Insert the termination into the MSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
PTKOG
Figure 4d. Installing the heat guard.
PTO-3
PTO-3
Installing Terminations with Built-In Frames
Vent Terminations
1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum of 4
PTO-3F
11
11
Figure 4a. Installing a PT0-3F termination.