Page | 14
35HP
–
Op Manual Rev 0 3/28/12
All specifications are subject to change without notice.
Inspect unit; make sure all guards and deflectors are in place. Check all nuts and bolts to ensure they
are installed and properly tightened to appropriate torque specifications.
Repair or replace, as necessary, any missing or damaged components before operating unit.
Clean the unit; especially areas such as fuel cell and air cleaner for dirt and debris. Fuel stored longer
than 2 months should be drained and replaced.
Reasonable care must be taken when operating equipment. Inspect work area and unit before
operating. Make sure all operators of this specific model machine are properly trained and have
reviewed all safety rules and precautions.
CHECK POINTS BEFORE OPERATION
Before Starting Engine: Review engine manual when necessary.
To Start Engine:
Check Oil level (Daily)
Turn fuel shut off valve to open
Put choke control in “CHOKE” position (Briggs VG only)
Move throttle control 1/3 of the way toward high speed position
Turn key to the START position
Let engine warm up. Slowly adjust CHOKE (Briggs VG only) toward “RUN” position
To Vacuum: Engine must be running.
Option 1: Hold the handle of intake nozzle and move in a sweeping motion over debris.
Option 2: Place intake nozzle on the ground and rake leafs and debris in the direction of the
nozzle opening.
To Stop Engine:
Move the throttle control to the slow position
Turn key to off position
Close fuel valve
Note: Impeller will continue to rotate for several seconds after engine is stopped.
Preparing for Operations
Solutions