background image

Installation Preparation

4

POWER SUPPLY

IMPORTANT - (Please read carefully)

WARNING:

FOR PERSONAL SAFETY, THIS APPLIANCE MUST
BE PROPERLY GROUNDED.

Remove house fuse or open circuit breaker before
beginning installation.

Do not use an extension cord or adapter plug with
this appliance. Follow National electrical codes or
prevailing local codes and ordinances.

Electrical supply

This vent hood must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp
circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above

requirements, call a licensed electrician before
proceeding.

• Route house wiring in the ceiling,  as close to the

installation location as possible.  Allow an addi-
tional 3 feet length from ceiling joists to reach the
junction box on the hood.

• Connect the wiring to the house wiring in accor-

dance with local codes.

Grounding instructions

The grounding conductor must be connected to a
ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the hood.

WARNING:

 The improper connection of

the equipment-grounding conductor can result in a
risk of electric shock. Check with a qualified electri-
cian or service representative if you are in doubt
whether the appliance is properly grounded.

TOOLS AND MATERIALS
REQUIRED 

(NOT SUPPLIED)

• Tape measure
• Knife
• Spirit level
• Wire cutter/stripper
• Wire nuts
• Electric drill and 5/32” bit
• Phillips and flat blade screwdrivers
• Hammer
• Pliers
• 10 mm Hex wrench/socket
• Safety glasses
• Gloves to protect against sharp edges
• 120V 60Hz. 15 or 20 Amp, 2 wire with ground. Properly grounded

branch circuit.

• Strain relief for junction cover.
• Plumb
• Center punch
• 6" round duct, length to suit installation.

PLAN THE LOCATION

Determine the exact location of the vent hood.
• Use a plumb to check location to be sure

countertop/cooktop location below the hood will
align exactly.

• The hood should project forward 1-1/2” beyond

the front edge of the cooking appliance. See
illustration.

• Observe the recommended space between the

cooking surface and bottom of hood.

Ceiling

Hood 
Ducting 
Centerline

Side View

Approx. 1-1/2"
Beyond Cooking
Surface

Cooktop

Countertop

27-1/2"

Hood

Front

13-3/4"

Содержание ZXR8510

Страница 1: ...good things to life If you have questions call 800 GE CARES or visit our website at www monogram com Installation Instructions Monogram ZXR858 ZXR859 and ZXR8510 Recirculating Accessories For Model ZV850 Island Vent Hood ...

Страница 2: ...oduct Dimensions 3 Power Supply 4 Tools and Materials Required 4 Remove Packaging Check Contents 5 Install Ceiling Support 6 Installation Instructions Step 1 Mount Template 6 Step 2 Install Upper Support Frame 7 2 BEFORE YOU BEGIN Read these instructions completely and carefully IMPORTANT Save these instructions for local inspector s use IMPORTANT Observe all governing codes and ordinances Note to...

Страница 3: ...d charcoal filters PRODUCT DIMENSIONS The vent hood must be installed 24 min and 30 max above the cooking surface 25 1 2 is recommended for best performance and to insure that the duct cover meets the ceiling The cooking surface should be at least 36 above the floor Installation will be easier if the vent hood is installed before the cooktop and countertop is installed 26 1 4 for 8 ft Ceiling Usin...

Страница 4: ... metal permanent wiring system or an equipment grounding terminal or lead on the hood WARNING The improper connection of the equipment grounding conductor can result in a risk of electric shock Check with a qualified electri cian or service representative if you are in doubt whether the appliance is properly grounded TOOLS AND MATERIALS REQUIRED NOT SUPPLIED Tape measure Knife Spirit level Wire cu...

Страница 5: ...at Washers 4 10mm Nuts and Lock Washers 8 Frame Attachment Screws with Washers attached to accessory support frames 2 Phillips Head Decorative Screws 2 side bars with 4 Machine screws 4 Hex head wood lag screws 6mm x 2 1 2 or 1 4 x 2 1 2 Template Check service manual envelope taped to the front on the hood to be sure it contains one stop screw Leave this screw in the envelope Check contents of the...

Страница 6: ...ng Finish the Ceiling Once the ceiling is finished mark the location of the ceiling joist and cross framing Check to be sure that ceiling is level use shims if necessary Arrange cross framing in the ceiling to suit the existing structure See examples Secure each 2 x 4 block with at least four 4 10 wood screws 3 long minimum size screws not supplied Use 8 wood screws total for the two supports The ...

Страница 7: ...upper support frame to the ceiling joists and or cross framing with the 4 screws provided For maximum rigidity and strength the screws must be driven into the center of the joists and or cross framing Check to be sure the support frame is level vertically and horizontally Important Again check to be sure the support is level in both directions There is no way to level the hood after the hood is se...

Страница 8: ...he required length 4 SECURE WIRING Route house wiring through the ceiling hole and pull a length to reach the hood junction box approximately 6 below the support Note The top and bottom of the duct are external female connections The bottom end should be flared slightly to facilitate installation of the hood Install duct up through support frames onto the top duct connector Push duct up until it i...

Страница 9: ...cate the stop screw in the envelope taped to the front of the hood Set aside Slide the lower decorative duct over the installed upper duct and push up past the stop screw location Install the supplied temporary stop screw in one of 3 holes in the support frame or the top duct cover to prevent the bottom decorative duct cover from sliding down CAUTION The stop screw must be installed Failure to do ...

Страница 10: ...n Duct Connector to House Duct Stop Screw Install 4 lock washer and 4 Nuts Bottom Duct Cover 8 CONNECT ELECTRICAL Verify that power is turned off at the source WARNING If house wiring is not 2 wire with a ground wire a ground must be provided by the installer When house wiring is aluminum be sure to use UL approved anti oxidant compound and aluminum to copper connectors Install strain relief onto ...

Страница 11: ...e filter into the lower slots at the rear of the opening Lift the filter and pull the knob forward until the filter rests on the slots Install all 3 grease filters To remove the filters grasp the knob push the filter towards the rear and tilt downwards Grasp tabs on charcoal filters push towards the rear and tilt downwards 11 FINALIZE INSTALLATION Remove the protective film covering the control pa...

Страница 12: ...mer information service at 800 626 2000 any time day or night For MonogramTM local service in your area call 1 800 444 1845 Note Product improvement is a continuing endeavor at General Electric Therefore materials appearance and specifications are subject to change without notice Monogram General Electric Company Louisville KY 40225 Pub No 49 80045 1 Dwg No 164D4290P014 N D 728 12 00 Printed in It...

Отзывы: