Installation Preparation
WARNING:
TO REDUCE THE RISK OF FIRE, ELECTRICAL
SHOCK OR INJURY TO PERSONS, OBSERVE
THE FOLLOWING:
A.
Use this unit only in the manner intended by the
manufacturer. If you have any questions, contact the
manufacturer.
B.
Before servicing or cleaning unit, switch power off
at the service panel and lock service panel to prevent
power from being switched on accidentally. If the
service panel cannot be locked, fasten a tag or
prominent warning label to the panel.
For general ventilating use only. Do not use to
exhaust hazardous or explosive materials or vapors.
Structural framing, installation work and electrical
wiring must be done by qualified person(s). In
accordance with all applicable codes and standards
including fire-rated construction.
Sufficient air is needed for proper combustion and
exhausting of gases through the flue (chimney) of
fuel burning equipment to prevent back drafting.
Follow the heating equipment manufacturer’s
guideline and safety standards such as those pub-
lished by the National Fire Protection Association
(NFPA), and the American Society for Heating,
Refrigeration and Air Conditioning Engineers
(ASHRAE), and the local code authorities.
Local codes vary. Installation electrical connections
and grounding must comply with applicable codes. In
the absence of local codes, the vent should be
installed in accordance with National Electrical Code
ANSI/NFPA 70-1990 or latest edition.
CONTENTS
Installation Preparation
Required Accessories .................................................. 3
Product Dimensions ................................................... 3
Power Supply .............................................................. 4
Tools and Materials Required .................................... 4
Remove Packaging, Check Contents ......................... 5
Install Ceiling Support ............................................... 6
Installation Instructions
Step 1, Mount Template ............................................. 6
Step 2, Install Upper Support Frame ........................ 7
2
BEFORE YOU BEGIN
Read these instructions completely and carefully.
•
IMPORTANT
- Save these instructions for
local inspector’s use.
•
IMPORTANT
- Observe all governing
codes and ordinances.
•
Note to Installer
- Be sure to leave these instruc-
tions with the Consumer.
•
Note to Consumer
- Keep these instructions with
your Owner’s Manual for future reference.
•
Skill Level
– Installation of this appliance requires
basic mechanical and electrical skills.
•
Completion time
– 1 to 3 hours.
• Proper installation is the responsibility of the installer.
• Product failure due to improper installation is not
covered under the Warranty.
For Monogram local service in your area,
1-800-444-1845.
For Monogram service in Canada, call
1-888-880-3030.
For Monogram Parts and Accessories, call
1-800-626-2002.
CAUTION:
Due to the weight and size of this vent hood and to
reduce the risk of personal injury or damage to the
product,
TWO PEOPLE ARE REQUIRED FOR
PROPER INSTALLATION.
WARNING:
The improper connection of
the equipment-grounding conductor can result in a risk
of electric shock. Check with a qualified electrician or
service representative if you are in doubt whether the
appliance is properly grounded.
Step 3, Install Lower Support Frame ......................... 7
Step 4, Secure Wiring ................................................. 8
Step 5, Size and Install Ductwork .............................. 8
Step 6, Install Decorative Duct Covers ...................... 9
Step 7, Install Hood .................................................. 10
Step 8, Connect Electrical ........................................ 10
Step 9, Slide Duct Covers Down,
Install Utility Bars ....................................... 11
Step 10, Install Filters ............................................... 11
Step 11, Finalize Installation .................................... 11