![Monogram ZIR300NPKII Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/monogram/zir300npkii/zir300npkii_installation-instructions-manual_1827862010.webp)
10
31-49133-1
STEP 3 PREPARING UNIT FOR INSTALLATION
Ŷ
Place the right hand unit in front of the installation
opening in a way that the unit is in front of the intended
installed location.
Ŷ
If doors will be reversed after installing, the stabilization
bracket at the top hinge side of the case will need to
be moved to the opposite side of the case. Remove 4
Phillips head screws, rotate the stabilization bracket
and install on the opposite side of the case.
Ŷ
Unpack the
heater Unification Kit (ZUGC) and make
sure all of the components on the list are included.
Ŷ
Install 4 bumper blocks by snapping them to the left
side of the case between the 2 units - 2 on the upper
section of the case wall and 2 on the lower.
Ŷ
Install adhesive heater on the outside of the unit to
the left side of the case. Install heater 2” below the top
2 standoff blocks. Heater should be centered front to
back on the metal case. Ensure the heater connector
cord is toward the bottom of the unit when installed.
Ŷ
Remove the left access cover by removing 4 (1/4”) hex
screws. The cover is located at the outside lower left
side of the case.
Ŷ
Use clips to adhere loose wire tightly to side of case as
shown. Clean the side using rubbing alcohol to ensure
proper clip adhesion.
Installation Instructions - Dual Integrated Installation
Upper bumpers
Lower bumpers
Stabilization
Bracket
Ǝ
Adhesive
Heater
Clips
Hex
Screws
Left Access
Cover