FUSION Compact Bread Plant, Rev. A21 14-04-21
16
Notes on Divider installation
DO NOT ATTEMPT TO LIFT THE
DIVIDER BY HUMAN FORCE (LIFTING)
Use of a
forklift or crane
is recommended for lifting or the machine can be
pushed on the castors provided.
To lift with a forklift -
the machine must be secured to a pallet.
To lift with a crane
- lifting eyes are provided.
Check that the power rating on the serial number plate matches
the supply that the machine is to be connected to.
The Dough Divider should be connected to a power socket on the prover.
DIVIDER INSTALLATION
LIFTING EYES
POWER SOCKETS
Содержание fusion compact
Страница 4: ...FUSION Compact Bread Plant Rev A21 14 04 21 4 ...
Страница 9: ...FUSION Compact Bread Plant Rev A21 14 04 21 9 BREADPLANT ASSEMBLED SECTION 1 ...
Страница 35: ...FUSION Compact Bread Plant Rev A21 14 04 21 35 THIS INFORMATION IS NOT AVAILABLE AT THE MOMENT ...
Страница 56: ...FUSION Compact Bread Plant Rev A21 14 04 21 56 THE FOLLOWING SHOULD ONLY BE USED BY TRAINED SERVICE ENGINEERS ...
Страница 57: ...FUSION Compact Bread Plant Rev A21 14 04 21 57 ...
Страница 58: ...FUSION Compact Bread Plant Rev A21 14 04 21 58 ...
Страница 59: ...FUSION Compact Bread Plant Rev A21 14 04 21 59 ...
Страница 60: ...FUSION Compact Bread Plant Rev A21 14 04 21 60 ...
Страница 61: ...FUSION Compact Bread Plant Rev A21 14 04 21 61 YASKAWA INVERTER DEFAULT SETTINGS ...
Страница 64: ...FUSION Compact Bread Plant Rev A21 14 04 21 64 ELECTRICAL DISTRIBUTION ...
Страница 65: ...FUSION Compact Bread Plant Rev A21 14 04 21 65 CONTROL CIRCUIT ...
Страница 84: ...FUSION Compact Bread Plant Rev A21 14 04 21 84 ...
Страница 85: ...FUSION Compact Bread Plant Rev A21 14 04 21 85 11 0 ELECTRICAL INFORMATION ...
Страница 86: ...FUSION Compact Bread Plant Rev A21 14 04 21 86 ...
Страница 87: ...FUSION Compact Bread Plant Rev A21 14 04 21 87 ...