
MOHAWK MODEL TR-25A, FL-25, TR-19
14
INSTALLATION INSTRUCTIONS
SET THE MAIN SIDE OF THE FORE CROSSRAIL INTO PLACE AT THE
BASE OF THE MAIN SIDE POSTS. BLOCK UP USING THE 4 X 4 X 12”
DUNNAGE.
ROUTE THE FORE CROSSRAIL CHAIN THROUGH THE FORE
CROSSRAIL.
SET THE MAIN SIDE TRACK INTO PLACE. BLOCK UP USING THE 8 X
8 X 24” DUNNAGE.
SET THE OFF SIDE TRACK INTO PLACE. BLOCK UP USING THE 8 X 8
X 24” DUNNAGE NOTE THAT THE RACE FOR THE RJ-25 IS TO BE TO
THE INSIDE OF THE TRACKS.
SET THE MAIN SIDE OF THE AFT CROSSRAIL INTO PLACE AT THE
BASE OF THE MAIN SIDE POSTS. BLOCK UP USING THE 4 X 4 X 12”
DUNNAGE.
ROUTE THE AFT CROSSRAIL CHAIN THROUGH THE AFT
CROSSRAIL.
ASSEMBLE THE FOUR LIFTING CHAINS (TWO SHORT & TWO LONG)
FROM THE HYDRAULIC CYLINDER TO THE CHAIN BLOCKS ON THE
CROSSRAILS.
SET THE TWO OFF SIDE POST INTO PLACE ON THE FLOOR LAYOUT.
ASSEMBLE THE CHAIN CONNECTORS AT THE THROUGH HOLES AT
THE TOP OF THE OFF SIDE POSTS. TIGHTEN THE CHAIN
CONNECTORS SO THAT THE CONNECTOR IS PAST / INTO THE
NYLON.
NOTE
x
DO NOT DRILL THE ANCHOR HOLES FOR THE OFF SIDE POST.
THIS WILL BE PERFORMED AS A FINAL PART OF THE
INSTALLATION.
ASSEMBLE THE TWO TRACK STOPS TO THE FORE END OF THE
TRACKS USING THE EIGHT 3/4 X 2-1/2” BOLTS, AND NYLON LOCK
NUTS.
ASSEMBLE THE RAMPS TO THE AFT END OF THE TRACKS USING
THE EIGHT 3/4 X 2-1/2” BOLTS, AND NYLON LOCK NUTS.
INSTALL THE PNEUMATIC LOCK RELEASE COMPONENTS PER THE
INSTRUCTIONS AND DIAGRAMS ON DWG. 025-012-128.
INSTALL A CLEAN DRY SHOP AIR SUPPLY TO THE REGULATOR.
SET REGULATOR TO 80 P.S.I.
CYCLE THE LOCK RELEASE AND ENSURE THAT ALL FOUR LOCKS
ARE RELEASING PROPERPLY.
CHECK FOR ANY AIR LEAKS, CORRECT AS REQUIRED BEFORE
PROCEDING TO THE NEXT STEP.
TURN THE ELECTRIC CIRCUIT BREAKER FOR THE UNIT ON.
NOTE THE POSITION OF THE MAIN SIDE TRACK. ALIGN THE TABS
ON THE CROSSRAILS TO THE MAIN SIDE TRACKS. ALSO SET THE
OFF SIDE TRACK AT EIGHT FEET FROM THE OUTSIDE OF THE MAIN
SIDE TRACK.
ENGAGE THE UP BUTTON RAISING THE UNIT APPROXIMATELY
THREE FEET.
CYCLE THE UNIT 2 TIMES NOTING THE POSITION OF THE
CROSSRAILS INSIDE THE POSTS.
LOWER THE UNIT ONTO THE MECHANICAL LOCKS. VERIFY A
POSITIVE LOCK SEAT ON THE MAIN AND OFF SIDE POSTS.
(MECHANICAL LOCK TO LATCH RACK IN POST) ADJUST THE OFF
SIDE POST AS NEEDED TO ACHIEVE A GOOD SEAT.
NOTE
x
ENSURE LEVEL POSTS AND A GOOD LOCK SEAT ON THE MAIN
AND OFF SIDE POST BEFORE DRILLING THE MOUNTING
HOLES.
DRILL THE MOUNTING HOLES IN THE CONCRETE USING THE
HOLES IN THE BASE PLATE AS A DRILL GUIDE.. SECURE THE OFF
SIDE POSTS TO THE SHOP FLOOR USING THE EIGHT 3/4 X 5” WEJ-IT
ANCHORS.
LEVELING THE TRACKS
LEVEL THE TRACKS FRONT TO REAR BY ADJUSTING THE CHAIN
CONNECTORS AT THE END OF THE HYDRAULIC CYLINDER.
LEVEL THE TRACKS SIDE TO SIDE BY ADJUSTING THE CHAIN
CONNECTORS AT THE TOP OF THE OFF SIDE POSTS.
NOTE
x
ALL BOLTS USING NYLON LOCK NUTS. ALL BOLTS MUST
EXTEND PAST THE NYLON BY THREE THREADS. THIS
INCLUDES THE ADJUSTABLE CHAIN CONNECTORS.
SECURE THE TWO HYDRAULIC HOSES TO THE TOP RAIL USING
THE THREE HOSE CLAMPS AND 5/16 SELF TAPING SCREWS.
REFERENCE DIAGRAM IN BACK OF MANUAL. APPLY ALL DECAL IN
APPROPRIATE LOCATIONS.
NOTE
x
APPLY DECALS TO A CLEAN, OIL & DIRT FREE SURFACE.
Содержание FL-25
Страница 21: ...MOHAWK MODEL TR 25A FL 25 TR 19 21 Figure 1 ...
Страница 22: ...MOHAWK MODEL TR 25A FL 25 TR 19 22 Figure 2 ...
Страница 23: ...MOHAWK MODEL TR 25A FL 25 TR 19 23 Figure 3 ...
Страница 24: ...MOHAWK MODEL TR 25A FL 25 TR 19 24 Figure 4 ...
Страница 25: ...MOHAWK MODEL TR 25A FL 25 TR 19 25 Figure 5 ...
Страница 26: ...MOHAWK MODEL TR 25A FL 25 TR 19 26 Figure 6 ...
Страница 27: ...MOHAWK MODEL TR 25A FL 25 TR 19 27 Figure 7 ...
Страница 28: ...MOHAWK MODEL TR 25A FL 25 TR 19 28 Figure 8 ...
Страница 29: ...MOHAWK MODEL TR 25A FL 25 TR 19 29 Figure 9A ...
Страница 30: ...MOHAWK MODEL TR 25A FL 25 TR 19 30 Figure 9B ...
Страница 31: ...MOHAWK MODEL TR 25A FL 25 TR 19 31 Figure 9C ...
Страница 32: ...MOHAWK MODEL TR 25A FL 25 TR 19 32 Figure 10 ...
Страница 33: ...MOHAWK MODEL TR 25A FL 25 TR 19 33 Figure 11 ...
Страница 34: ...MOHAWK MODEL TR 25A FL 25 TR 19 34 Figure 12 ...
Страница 35: ...MOHAWK MODEL TR 25A FL 25 TR 19 35 Figure 13A ...
Страница 36: ...MOHAWK MODEL TR 25A FL 25 TR 19 36 Figure 13B ...
Страница 37: ...MOHAWK MODEL TR 25A FL 25 TR 19 37 Figure 14 ...
Страница 39: ...MOHAWK MODEL TR 25A FL 25 TR 19 39 ...
Страница 40: ...MOHAWK MODEL TR 25A FL 25 TR 19 40 ...
Страница 41: ...MOHAWK MODEL TR 25A FL 25 TR 19 41 ...
Страница 42: ...MOHAWK MODEL TR 25A FL 25 TR 19 42 ...
Страница 43: ...MOHAWK MODEL TR 25A FL 25 TR 19 43 ...
Страница 44: ...MOHAWK MODEL TR 25A FL 25 TR 19 44 ...
Страница 45: ...MOHAWK MODEL TR 25A FL 25 TR 19 45 ...
Страница 46: ...MOHAWK MODEL TR 25A FL 25 TR 19 46 ...
Страница 47: ...MOHAWK MODEL TR 25A FL 25 TR 19 47 ...
Страница 48: ...MOHAWK MODEL TR 25A FL 25 TR 19 48 ...
Страница 49: ...MOHAWK MODEL TR 25A FL 25 TR 19 49 ...
Страница 50: ...MOHAWK MODEL TR 25A FL 25 TR 19 50 ...
Страница 51: ...MOHAWK MODEL TR 25A FL 25 TR 19 51 ...
Страница 55: ...MOHAWK MODEL TR 25A FL 25 TR 19 55 ...
Страница 56: ...MOHAWK MODEL TR 25A FL 25 TR 19 56 ...