Mohawk FL-25 Скачать руководство пользователя страница 13

MOHAWK MODEL TR-25A, FL-25,TR-19 

13 

INSTALLATION INSTRUCTIONS 

IMPORTANT 

READ THIS MANUAL IN ITS ENTIRETY. BE FAMILIAR WITH PART NAMES AND HAVE A GOOD UNDERSTANDING OF 
HOW THIS UNIT IS TO BE ASSEMBLED AND OF HOW INDIVIDUAL PARTS OPERATE, BEFORE ASSEMBLING THE 
UNIT. 

USING  A  CHALK  LINE,  LAYOUT  THE  FLOOR  DIMENSIONS  WHERE 
THE UNIT WILL BE LOCATED. 

NOTE  

x

ALWAYS  VERIFY  A  TRUE  SQUARE  BY  MEASURING  FROM
CORNER TO OPPOSITE CORNER.

USING  A  TRANSIT  OR  WATER  LEVEL,  VERIFY  LEVEL  FLOOR  AT 
EACH  POST  LOCATION.  REFERENCING  THE  HIGHEST  POINT,  USE 
SHIM  PLATES  TO  INSURE  A  LEVEL  ASSEMBLY.  (MOHAWK  PART  # 
025-000-110)

CUT  ALL  BANDING  AND  DISCARD.  USE  THE  PACKING  LIST  TO 
VERIFY  PARTS  COUNT.  PLEASE  NOTIFY  THE  MOHAWK  SERVICE 
DEPARTMENT TO ORDER ANY MISSING PARTS ( 1-800-833-2006 ). 

NOTE 

x

SAVE ALL PACKING BOLTS AS THEY ARE USED IN THE 
ASSEMBLY. DO NOT RE-USE THE NYLON LOCK NUTS.

 

ALIGN  THE  MAINSIDE  POSTS  BASE  PLATES  TO  THE  CHALK  LINE 
LAYOUT. 

USING  A  FORK  LIFT  TRUCK,  ALIGN  THE  TOP  RAIL  TO  THE  MAIN 
SIDE POSTS.  

SECURE  THE  TOP    RAIL    TO  THE    MAIN  SIDE    POST    USING    THE 
FOUR 1/2 X 2 “ BOLTS, WASHERS AND NYLON LOCK NUTS. 

NOTE 

x

ALL  BOLTS  USING  NYLON  LOCK  NUTS.  ALL  BOLTS  MUST
EXTEND  PAST  THE  NYLON  BY  THREE  THREADS.  THIS
INCLUDES THE ADJUSTABLE CHAIN CONNECTORS.

WARNING

 

x

DO NOT REMOVE THE FORK LIFT TRUCK FROM BENEATH THE
TOP RAIL UNTIL THE POST HAVE BEEN SECURELY MOUNTED 
TO THE TOP RAIL AND SHOP FLOOR.

 

INSURE  THE  MAIN    POSTS  ARE  SQUARE  AND  LEVEL  TO  EACH 
OTHER, AND ARE IN PROPER ALIGNMENT TO THE FLOOR LAYOUT. 
DRILL  THE  MOUNTING  HOLES  IN  THE  CONCRETE  USING  THE 
HOLES IN THE BASE PLATE AS A DRILL GUIDE. SECURE THE MAIN 
SIDE POSTS TO THE SHOP FLOOR USING THE EIGHT 3/4 X 5” WEJ-IT 
ANCHORS.

 

MOUNT THE POWER UNIT ON THE APPROPRIATE MAIN SIDE POST 
USING  THE  FOUR  5/16  X  1”  BOLT,  WASHER,  AND  NYLON  LOCK 
NUTS.  

REMOVE  THE  BREATHER  CAP  PORT  PLUG  AND  DISCARD.  INSERT 
AND HAND TIGHTEN THE BREATHER CAP. 

ASSEMBLE  THE  POWER  UNIT  LOWERING  HANDLE  TO  THE  EYE 
BOLT ON THE LOWERING VALVE ASSEMBLY USING THE WASHER 
AND COTTER PIN. 

ASSEMBLE  THE  TWO  HYDRAULIC  HOSES  TO  THE  HYDRAULIC 
CYLINDER.  CONNECT  THE  HOSE  FROM  THE  ROD  END  OF  THE 
CYLINDER TO THE POWER UNIT RESERVOIR. CONNECT THE HOSE 
FROM THE BLIND END OF THE CYLINDER TO THE PRESSURE PORT 
ON THE POWER UNIT. 

AT THIS TIME HAVE A QUALIFIED ELECTRICIAN 

CONNECT THE POWER SUPPLY TO THE UNIT 

ENGAGE THE UP BUTTON ON THE POWER UNIT. FULLY EXTEND 
THE HYDRAULIC CYLINDER.  

NOTE

 

x

KEEP THE CHAIN CONNECTOR AT THE END OF THE CYLINDER
IN PROPER ALIGNMENT (CAM BEARING ON BOTTOM ) AS THE
CYLINDER IS BEING EXTENDED.

TURN  OFF  THE  ELECTRIC CIRCUIT BREAKER TO THE UNIT AFTER 
EXTENDING THE HYDRAULIC CYLINDER.  

PULL DOWN ON THE POWER UNIT LOWERING HANDLE TO RELIEVE 
FLUID  PRESSURE.  REVERSE  THE  TWO  HYDRAULIC  HOSES  AT  THE 
POWER UNIT.   

WARNING / DANGER

DO  NOT  TWIST  OR  CROSS  THE  LIFTING  CHAINS  WHEN 
ROUTING. THIS WILL CAUSE THE CHAIN TO FAIL UNDER LOAD. 

ALL LEAVES MUST BE USED IN THE ASSEMBLY OF ALL MASTER 
LINKS.  NOTE CHAIN CONNECTING DIAGRAMS. 

ALWAYS USE A FLASH LIGHT TO VERIFY CHAIN CONDITION.

 

NOTE

 

x

REEFER TO CHAIN ROUTING DRAWINGS 

ASSEMBLE  THE  TWO  CHAIN  CONNECTORS  TO  THE  MEDIUM 
LENGTH  CHAINS.  ASSEMBLE  THE  OPPOSITE  END  TO  THE  CHAIN 
CONNECTOR AT THE BASE OF THE MAIN SIDE POST. 

ROUTE  THE  TWO  LONG  CHAINS  THROUGH  THE  TOP  RAIL  AND 
BOTTOM BEARINGS ON THE TOP RAIL. ASSEMBLE THE TWO CHAIN 
CONNECTORS TO THE CYLINDER END OF THE CHAINS. ASSEMBLE 
THE  CHAIN  CONNECTORS  TO  THE  CHAIN  BLOCK  AT  THE  END  OF 
THE CYLINDER. TIGHTEN THE CHAIN CONNECTORS SO THAT THE 
CONNECTOR IS PAST / INTO THE NYLON.

 

ASSEMBLE  THE  TWO  CHAIN  CONNECTOR  TO  THE  TWO  SHORT 
CHAINS.  ASSEMBLE  THE  CHAIN  CONNECTORS  TO  THE  CHAIN 
BLOCK  AT  THE  END  OF  THE  CYLINDER.  TIGHTEN  THE  CHAIN 
CONNECTORS  SO  THAT  THE  CONNECTOR  IS  PAST  /  INTO  THE 
NYLON.  ROUTE  THE  TWO  SHORT  CHAINS  OVER  THE  TOP 
BEARINGS ON THE TOP RAIL.  

ROUTE  THE  OPPOSITE  END  OF  THE  TWO  SHORT  AND  TWO  LONG  
CHAINS THROUGH THE TOP OF THE MAIN SIDE POSTS. 

Содержание FL-25

Страница 1: ...ARTS READ MANUAL THOROUGHLY BEFORE INSTALLING OPERATING OR MAINTAINING LIFT MOHAWK 76 MOHAWK INDUSTRIAL PARK 9ROOMAN AVE P O BOX 110 AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIL TECHSUPPORT MOHAWKLIFTS COM FILE FL25 TR25 TR19 SERIES 12 1 2015 doc REVISION DATE 12 1 2015 P N 601 800 358 MODEL TR 25A FL 25 TR 19 ...

Страница 2: ...ries from other lifts are not acceptable and could result in injury to the user WARNING Loading of the jacking beams or combination of jacking beams above the rated capacity of the lift itself could result in personal injury to the operator and or damage to the lift and or vehicle The load rating of any jacking beam or combination of jacking beams on this unit must not exceed the rated capacity of...

Страница 3: ...Here Please have this unit s model and serial number when calling for service Model Number ______________________ Serial Number ______________________ OR CONTACT Mohawk Lifts LLC 65 Vrooman Ave P O Box 110 Amsterdam NY 12010 Toll Free 1 800 833 2006 Local 1 518 842 1431 Fax 1 518 842 1289 Internet www MOHAWKLIFTS com E Mail Service MOHAWKLIFTS com ...

Страница 4: ...T SOME ITEMS ON LIFT ARE SUBJECT TO NORMAL WEAR AND TEAR AND ARE NOT COVERED UNDER THIS WARRANTY STRUCTURAL AND MECHANICAL COMPONENTS ALL LIFTS STRUCTURAL AND MECHANICAL COMPONENTS OF THIS UNIT ARE GUARANTEED FOR THE BELOW STATED TIME FRAME SPECIFIC TO MODEL LISTED FROM THE DATE OF SHIPMENT FROM FACTORY AGAINST DEFECTS IN WORKMANSHIP AND OR MATERIALS WHEN LIFT IS INSTALLED AND USED ACCORDING TO SP...

Страница 5: ...DEFECTS IN WORKMANSHIP AND OR MATERIALS WHEN LIFT IS INSTALLED AND USED ACCORDING TO SPECIFICATIONS WARRANTY EXCEPTIONS ALL LIFTS ADJUSTMENTS THIS WARRANTY DOES NOT COVER CASUAL AND ROUTINE ADJUSTMENTS SUCH AS BUT NOT LIMITED TO FITTINGS SENSORS AND SWITCHES ANCHOR BOLT RE TIGHTENING OR ANY SHIMMING OR ADJUSTMENTS REQUIRED DURING A PROPER AND PROFESSIONAL INSTALLATION BY A QUALIFIED INSTALLER MAIN...

Страница 6: ... CHAIN ASSEMBLY DIAGRAMS 10 HYDRAULIC SYSTEM CONNECTIONS 11 CHAIN POST SHIMMING 12 ANCHOR BOLT SPECS SPADE TYPE 13 CHAIN INSPECTION MAINTENANCE PROCEDURE 14 PARTS DRAWINGS TR 25 FL 25 TR 19 w 13 20 25 30 Tracks Figure ISOMETRIC FINAL ASSEMBLY MAN920 HYDRAULIC SYSTEM MAN901 TOP RAIL ASSEMBLY MAN904 CYLINDER ASSEMBLY MAN910 CROSSRAIL ASSEMBLY FORE 025 020 027 CROSSRAIL ASSEMBLY AFT 025 020 029 CHAIN...

Страница 7: ...ND OR THE POSSIBILITY OF POURING A NEW LEVEL CONCRETE SLAB SECTION SEE FIGURE 1 SIMPLY STATED FOR OPTIMUM LEVEL LIFTING THE EQUIPMENT AT BEST CAN LIFT ONLY AS LEVEL AS THE FLOOR ON WHICH IT IS LOCATED AND SHOULD NOT BE EXPECTED TO COMPENSATE FOR DRASTIC FLOOR SLOPE DIFFERENCES THIS EQUIPMENT MUST BE INSTALLED ON A LEVEL CONCRETE FLOOR WITH A MINIMUM THICKNESS OF 4 1 2 THE CONCRETE MUST BE AGED AT ...

Страница 8: ...29 FEET 19 FEET 20 19 FEET 36 FEET 19 FEET 25 19 FEET 41 FEET 19 FEET 30 19 FEET 46 FEET 19 FEET NOTE THE PLACEMENT OF THE UNIT IS DETERMINED BY THE TYPE LENGTH WIDTH HEIGHT OF VEHICLE BEING SERVICED WEJ IT ANCHOR SPECIFICATIONS LENGTH DRILL DEPTH DRILL SIZE DRILL SIZE MIN MAX TORQUE N A 5 INCH 5 INCH INCH 775 787 INCH INCH SEE ANCHOR SPECS REFER TO ANCHOR BOLT SPECIFICATION IN BACK OF MANUAL PRE ...

Страница 9: ... 002 053 Hose Assembly 3 8 ID x 168 1 600 670 008 Wej It 3 4 x 5 1 2 16 025 000 107 Chain Connector 6 600 710 012 Washer Flat 7 8 ID 12 600 680 021 Nut Plain 7 8 14 NF 12 601 800 061 Decal Mohawk 4 601 800 035 Decal Caution 1 601 800 034 Decal Warning 1 601 800 045 Decal Capacity 25 000 FOR TR 25 FL 25 ONLY 2 601 800 121 Decal Capacity 19 000 FOR TR 19 ONLY 2 601 800 030 Decal Made In America 4 60...

Страница 10: ... NEMA L14 20R 1 601 310 005 Breather Cap 1 600 830 026 Master Chain Link Assembly 12 601 600 050 Plastic Pull Tie 8 Lg 27 601 600 045 Cable Tie Holder 15 600 690 003 Nut Lock Nylon 3 4 16 NF 16 025 012 083 Parts Bag 3 Small Parts 601 600 022 Bag 9 x 12 1 601 510 024 Gauge 1 601 510 025 L Bracket 1 601 510 026 Regulator 1 600 600 001 Screw 10 32 x 1 2 Thread Cutting Pan Head 2 025 012 101 Top Rail ...

Страница 11: ...ICE GRIPS AS NEEDED 1 CRESCENT WRENCH AS NEEDED 1 50 FT FISH TAPE PULL CHAIN 1 4 FT BUBBLE LEVEL VERIFY LEVEL ASSEMBLY 1 PRY BAR MOVING HEAVY ITEMS 1 TIN SNIPS PACKAGING BANDING 1 CHALK LINE FLOOR LAYOUT 1 SOAP STONE FLOOR LAYOUT 1 25 FT TAPE MEASURE FLOOR LAYOUT SQUARING POST 1 50 FT TAPE MEASURE FLOOR LAYOUT SQUARING POST 1 MEDIUM HAMMER WEJ IT ANCHORS 8 FT STEP LADDER ASSEMBLE ELEVATED ITEMS 10...

Страница 12: ...DARD POWER UNIT IS 220 VOLT SINGLE PHASE REFER TO THE LIFT VERIFICATION SHEET FOR SPECIFICATIONS ON SPECIAL ORDERS THE POWER SUPPLY SHOULD BE AVAILABLE PRIOR TO INSTALLATION IT IS ADVISED TO HAVE A LICENSED ELECTRICIAN PERFORM ALL ELECTRICAL BAY SIZE NOTE WALKWAYS OVERHEAD OBSTRUCTIONS AND ABILITY TO MOVE EQUIPMENT IN THE BAY AREA REFER TO THE LIFT SPECIFICATIONS REFER TO THE LIFT VERIFICATION SHE...

Страница 13: ...RT AND HAND TIGHTEN THE BREATHER CAP ASSEMBLE THE POWER UNIT LOWERING HANDLE TO THE EYE BOLT ON THE LOWERING VALVE ASSEMBLY USING THE WASHER AND COTTER PIN ASSEMBLE THE TWO HYDRAULIC HOSES TO THE HYDRAULIC CYLINDER CONNECT THE HOSE FROM THE ROD END OF THE CYLINDER TO THE POWER UNIT RESERVOIR CONNECT THE HOSE FROM THE BLIND END OF THE CYLINDER TO THE PRESSURE PORT ON THE POWER UNIT AT THIS TIME HAV...

Страница 14: ... THE REGULATOR SET REGULATOR TO 80 P S I CYCLE THE LOCK RELEASE AND ENSURE THAT ALL FOUR LOCKS ARE RELEASING PROPERPLY CHECK FOR ANY AIR LEAKS CORRECT AS REQUIRED BEFORE PROCEDING TO THE NEXT STEP TURN THE ELECTRIC CIRCUIT BREAKER FOR THE UNIT ON NOTE THE POSITION OF THE MAIN SIDE TRACK ALIGN THE TABS ON THE CROSSRAILS TO THE MAIN SIDE TRACKS ALSO SET THE OFF SIDE TRACK AT EIGHT FEET FROM THE OUTS...

Страница 15: ...EBRIS GREASE OIL x PERFORM THE PRE OPERATION CHECK LIST PER INSTRUCTIONS BEFORE RAISING VEHICLE TO DESIRED HEIGHT x BEFORE DRIVING VEHICLE INTO THE BAY POSITION ARMS AND SUPPORTS TO PROVIDE UNOBSTRUCTED CLEARANCE DO NOT HIT OR RUN OVER LIFT ARMS ADAPTERS OR AXLE SUPPORTS THIS COULD DAMAGE LIFT OR VEHICLE x LOAD VEHICLE ON LIFT CAREFULLY POSITION LIFT SUPPORTS TO CONTACT AT THE VEHICLE MANUFACTURER...

Страница 16: ...SARY REPAIRS HAVE BEEN COMPLETED LIFTING PROCEDURES OPERATION PERFORM PRE OPERATION CHECK LIST ITEM BY ITEM ENSURE UNIT IS COMPLETELY LOWERED POSITION THE VEHICLE ONTO THE UNIT CAUTION x AVOID SUDDEN STARTS AND STOPS DURING LOADING AND UNLOADING OF VEHICLE POSITION THE VEHICLE AS INDICATED BY THE MFG S RECOMMENDED LIFT POINTS NOTE x ALIGN THE CENTER OF GRAVITY C G OF THE VEHICLE WITH THE CENTERLIN...

Страница 17: ...ED 1 ALL O RING BOSS FITTINGS JAM NUTS ARE TO BE TIGHTENED TO 15 FOOT POUNDS TORQUE 2 ALL PIPE FITTINGS IF LEAKING ARE TO BE REMOVED RE SEALED AND RE INSTALLED SELECT UNITE THREAD SEALANT OR EQUIVALENT ON FITTING THREADS INSPECT ANCHOR CONDITIONS FOR ANY POSSIBLE CORROSION AND INSPECT THE FLOOR FOR ANY SIGNS OF FATIGUE OR FRACTURES INSPECT ALL BEARINGS FOR UNUSUAL OR EXCESSIVE WEAR REPLACE IF NEED...

Страница 18: ...OVE OBSTRUCTION RAISING UNEVEN POSTS OUT OF SQUARE VERIFY LEVEL MAKE ANY AND ALL NECESSARY ADJUSTMENTS SHOP FLOOR UNEVEN VERIFY PROPER INSTALLATION RAISING UNEVEN CONT POST NOT SHIMED CORRECTLY SHIM POST CHAIN OUT OF ADJUSTMENT ADJUST CHAINS SLOW DRIFT DOWN POSSIBLE CAUSE SOLUTION SAFETIES NOT ENGAGED RAISE UNIT TO RE ENGAGE SAFETIES THEN LOWER UNIT ONTO SAFETIES POWER UNIT LOWERING VALVE CONTAMIN...

Страница 19: ...ODEL TR 25A FL 25 TR 19 19 MODEL SERIAL NUMBER DATE OF INSTALLATION SERVICE CHART DATE PART REPLACED SERVICED SERVICE COMPANY SERVICED BY MAINTENANCE CHART DATE MAINTENANCE PERFORMED SERVICE COMPANY SERVICED BY ...

Страница 20: ...AMS MOHAWK 76 MOHAWK INDUSTRIAL PARK 9ROOMAN AVE P O BOX 110 AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIL TECHSUPPORT MOHAWKLIFTS COM MODELS TR 25A FL 25 TR 19 MADE IN THE USA ...

Страница 21: ...MOHAWK MODEL TR 25A FL 25 TR 19 21 Figure 1 ...

Страница 22: ...MOHAWK MODEL TR 25A FL 25 TR 19 22 Figure 2 ...

Страница 23: ...MOHAWK MODEL TR 25A FL 25 TR 19 23 Figure 3 ...

Страница 24: ...MOHAWK MODEL TR 25A FL 25 TR 19 24 Figure 4 ...

Страница 25: ...MOHAWK MODEL TR 25A FL 25 TR 19 25 Figure 5 ...

Страница 26: ...MOHAWK MODEL TR 25A FL 25 TR 19 26 Figure 6 ...

Страница 27: ...MOHAWK MODEL TR 25A FL 25 TR 19 27 Figure 7 ...

Страница 28: ...MOHAWK MODEL TR 25A FL 25 TR 19 28 Figure 8 ...

Страница 29: ...MOHAWK MODEL TR 25A FL 25 TR 19 29 Figure 9A ...

Страница 30: ...MOHAWK MODEL TR 25A FL 25 TR 19 30 Figure 9B ...

Страница 31: ...MOHAWK MODEL TR 25A FL 25 TR 19 31 Figure 9C ...

Страница 32: ...MOHAWK MODEL TR 25A FL 25 TR 19 32 Figure 10 ...

Страница 33: ...MOHAWK MODEL TR 25A FL 25 TR 19 33 Figure 11 ...

Страница 34: ...MOHAWK MODEL TR 25A FL 25 TR 19 34 Figure 12 ...

Страница 35: ...MOHAWK MODEL TR 25A FL 25 TR 19 35 Figure 13A ...

Страница 36: ...MOHAWK MODEL TR 25A FL 25 TR 19 36 Figure 13B ...

Страница 37: ...MOHAWK MODEL TR 25A FL 25 TR 19 37 Figure 14 ...

Страница 38: ...GS MOHAWK 76 MOHAWK INDUSTRIAL PARK 9ROOMAN AVE P O BOX 110 AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET WWW MOHAWKLIFTS COM E MAIL TECHSUPPORT MOHAWKLIFTS COM MODELS TR 25A FL 25 TR 19 MADE IN THE USA ...

Страница 39: ...MOHAWK MODEL TR 25A FL 25 TR 19 39 ...

Страница 40: ...MOHAWK MODEL TR 25A FL 25 TR 19 40 ...

Страница 41: ...MOHAWK MODEL TR 25A FL 25 TR 19 41 ...

Страница 42: ...MOHAWK MODEL TR 25A FL 25 TR 19 42 ...

Страница 43: ...MOHAWK MODEL TR 25A FL 25 TR 19 43 ...

Страница 44: ...MOHAWK MODEL TR 25A FL 25 TR 19 44 ...

Страница 45: ...MOHAWK MODEL TR 25A FL 25 TR 19 45 ...

Страница 46: ...MOHAWK MODEL TR 25A FL 25 TR 19 46 ...

Страница 47: ...MOHAWK MODEL TR 25A FL 25 TR 19 47 ...

Страница 48: ...MOHAWK MODEL TR 25A FL 25 TR 19 48 ...

Страница 49: ...MOHAWK MODEL TR 25A FL 25 TR 19 49 ...

Страница 50: ...MOHAWK MODEL TR 25A FL 25 TR 19 50 ...

Страница 51: ...MOHAWK MODEL TR 25A FL 25 TR 19 51 ...

Страница 52: ...L 25 TR 19 52 MOHAWK 76 65 VROOMAN AVE AMSTERDAM NY 12010 TOLL FREE 1 800 833 2006 LOCAL 1 518 842 1431 FAX 1 518 842 1289 INTERNET www MOHAWKLIFTS com E MAIN Service MOHAWKLIFTS com NEW SLAB RECOMMEDATIONS MADE IN THE USA ...

Страница 53: ...ation should be obtained from the firm who supplies the concrete mixture at the time of the pour The slab above is designed as stand alone and does not take into account the contribution of strength from surrounding concrete It may be desirable to reinforce the new slab to the pre existing surrounding floor Care should be taken to locate these specific reinforcement bars away from any anchor posit...

Страница 54: ...Min 220 Min 18 4 Main Bars 24 4 Temperature Bars 4 in Long Bars 8 in Short Bars 1 in 8 in TR 19 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in FL 25 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 25 24 Min 24 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 30 48 Min 48 Min 4 4 Bars 8 Bars Total 6 in Each Way 3 4 in 5 in TR 33 72 Min 72 Min 12 4 Bars 24 Bars ...

Страница 55: ...MOHAWK MODEL TR 25A FL 25 TR 19 55 ...

Страница 56: ...MOHAWK MODEL TR 25A FL 25 TR 19 56 ...

Страница 57: ...Model V 77 30S A ND VALIDATE D Model TR 75 A ND VALIDATE D Model 75 32 F The Lifts You Can t Wear Out TWO POST FOUR POST MOBILE COLUMN PARALLELOGRAM VERTICAL RISE MOHAWKLIFTPRODUCTS Mohawk Lifts LLC P O Box 110 65 Vrooman Ave Amsterdam NY 12010 Phone 800 833 2006 518 842 1431 www mohawklifts com ...

Страница 58: ...TS ARE USED WE HAVE CREATED AN ON LINE PHOTO DATABASE FOR CUSTOMERS TO VIEW OUR LIFTS IN USE VISIT WWW MOHAWKLIFTS COM PR AND MAYBE WE CAN ADD YOUR PHOTOS TO OUR COLLECTION JPG FORMATS PREFERED E MAIL YOUR PHOTOS AND COMMENTS TO PHOTOS MOHAWKLIFTS COM BEST REGARDS HAPPY LIFTING YOUR FRIENDS AT MOHAWK LIFTS ...

Отзывы: