10
‘
7.1 Operating warning
ATENTION!
Before operating the calender, operators must be enabled, qualified, trained
or authorised.
7.2 Operating Procedures
Plug the power cord to the machine as indicated on
page 16
;
Turn on the main switch (located on the front of the machine) Pic. 2d
Turn the switch on the machine panel as Pic. 3a,
Push the button to reset the safety drive located on the control panel. Pic. 3c
Picture 2
– PTP 1450 Isometric view
Control panel
Table
Electric panel
A
B
C
C
Manometer
D
E
F
Содержание PTP 1450
Страница 17: ...17 11 Pneumatic Scheme ...
Страница 18: ...18 12 Electric Scheme 12 1 Electric diagram biphasic 220V ...
Страница 19: ...19 12 2 Electric diagram three phase 220V ...
Страница 20: ...20 12 3 Electric diagram three phase 380V ...
Страница 21: ...21 13 ASSEMBLY DRAWINGS AND SPARE PARTS 13 1 Parts list ...
Страница 22: ...22 ...
Страница 23: ...23 13 2 General Set ...
Страница 24: ...24 ...
Страница 25: ...25 ...
Страница 30: ...30 15 4 Annex IV Digital Controller ...
Страница 33: ...33 ...