background image

Installation Manual

STRATUS

 II

STRATUS

 II

Содержание STRATUS II

Страница 1: ...Installation Manual STRATUS II STRATUS II...

Страница 2: ...e unit Room numbers and location in the building if applicable PREPARATION A support superstructure purchased separately or provided by others is to be constructed above the finished ceiling and firml...

Страница 3: ...ication and materials other than the rough in plate assembly are the responsibility of the engineer of record 2 Rough in plate is to be welded or bolted to support superstructure by customer contracto...

Страница 4: ...surface 1 All design fabrication and materials other than the rough in plate assembly are the responsibility of the engineer of record 2 Rough in plate is to be welded or bolted to support superstruc...

Страница 5: ...RE 0 05 ft 0 25 Plate to rest on this surface Vertical supports on 25 centers 1 All design fabrication and materials other than the rough in plate assembly are the responsibility of the engineer of re...

Страница 6: ...arm unit while installing Lift crate with arm into position and place the Stratus II arm assembly onto the studs and thread three hex nuts across from each other Level the Stratus II arm assembly wit...

Страница 7: ...ate into place using specified lift Figure 7 Level unit and tighten all nuts to at least 150 ft lbs Figure 8 When unit is secured to mounting plate remove crate Figure 6 Figure 7 Tighten these nuts AF...

Страница 8: ...e the column in position to prevent the unit from tipping over 2 Route gas hoses and electrical cables through arms Figure 9 3 Raise the Stratus II column to the mounting plate at the bottom of the lo...

Страница 9: ...the service entry bracket item 2 Brake Release Handle 1 Plug handle into wire harness protruding from the corner of the column and attach handle to track Figure 12 2 Tighten set screws on the side of...

Страница 10: ...gas piping systems have been completed ELECTRICAL CONNECTIONS 1 Ensure that all electrical power circuits are locked off prior to hook up 2 Review the wiring diagram or shop drawings 3 All connection...

Страница 11: ...otate the joint in the other direction and repeat steps 1 4 above FINAL ASSEMBLY Bearing Covers 1 Verify that all medical gas and electrical connections have been completed and successfully tested pri...

Страница 12: ...age safety cord Figure 18 3 Align push on connectors in the end cap with the connectors on the arm and tap end cap firmly to engage CARE AND MAINTENANCE 1 Clean with mild detergent and warm water Do n...

Страница 13: ...han those expressly contained herein WARRANTY Modular Services Company warrants that all equipment assemblies shall be free from defects in material and workmanship for a period of 12 months from the...

Страница 14: ...ses low voltage devices and range of motion are Stratus Warranty Checklist Please verify correct room side location for each unit and initial all of the items below that apply Any steps that are not c...

Отзывы: