WORK SURFACE
1
2
1/8"
Q
R
S
A
1
3
2
4
IMPORTANT:
Tighten bolts evenly.
Work surface clamp should sit flush
against the column, ensure there
are no gaps. Also, it is important the
work surface clamp is level.
i
Step 3
Two people may be required to
install work surface to column.
One to hold the work surface
and the second person to secure
the column clamp.
Slide utility tray onto work surface.
Utility tray simply rests on top of
work surface.
PAGE 5 OF 11
Содержание WS1-90
Страница 7: ...i EXTENSION BEAMS 1 8 1 3 2 Z BB AA V W X 1 8 Z 1 8 AA Step 5 optional PAGE 7 OF 11...
Страница 8: ...MONITOR TILTER STANDARD TILTER SPRING TILTER CC DD EE GG 1 2 Step 6 PAGE 8 OF 11...
Страница 9: ...i MONITOR CUPS 1 8 1 2 7 32 KK KK LL MM Step 7 PAGE 9 OF 11...
Страница 10: ...CABLE MANAGEMENT NN OO Step 8 PAGE 10 OF 11...