
•
Confirm the power cord is in good condition
• Ensure the belt is properly aligned on the rollers on each end
• Ensure the belt is properly tensioned
• Ensure all fasteners are tight and that there is no wobble in the frame
10. Using the TENSIONING TOOL, turn the BELT TENSIONING STUB to ensure that the belt is properly
tensioned. DO NOT OVER TORQUE THE BELT TENSIONING STUB, PERMANENT DAMAGE MAY RESULT.
The TENSIONING TOOL can be stored in the keyhole cutout on the CONTROL BOX.
11.
Once initial assembly is complete, inspect the conveyors to confirm that they are ready to operate:
9. Finally, to complete the hopper assembly, install the BACK PLATE on to the outside of the side panels
by aligning the screw holes and securing with 6 x ⅜” BUTTON HEAD SCREWS. The screw heads should
go on the inside of the hopper, and the 6 x ACORN NUTS can be used on the outside to firmly secure
the BACK PLATE.
Содержание M9 SORTER
Страница 2: ...CONTENTS...
Страница 4: ...SAFETY...
Страница 8: ...INITIAL SETUP...
Страница 12: ...4 Install the TALL H BASE UPRIGHT to the H BASE using the same hardware in the last step...
Страница 18: ...OPERATIONS...
Страница 27: ...CLEANING MAINTENANCE...